Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Osaero Manufacturing And Supply Of 31 Parts As A Package Ref Semfg466 Package 2
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2024/B/5394745 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | September 13, 2024 15:14 |
| End Date |
Expired
04/10/2024
Expired 740 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Manufacturing / fabrication and supply of mechanical spare parts required for jammu ropeway project (indian make).
Manufacturing / fabrication and supply of mechanical spare parts required for jammu ropeway project (indian make).
Read moreDesign, engineering, manufacturing, supply, testing, erection and commissioning for dcs package for hbl lauriya, west champaran, bihar.
Design, engineering, manufacturing, supply, testing, erection and commissioning for dcs package for hbl lauriya, west champaran, bihar.
Read moreDesign engineering manufacturing supply supervision for erection and commissioning of jet cooker package for hbl sugauli east champaran bihar
Design engineering manufacturing supply supervision for erection and commissioning of jet cooker package for hbl sugauli east champaran bihar
Read moreDesign, engineering, manufacturing, supply, supervision for erection and commissioning of jet cooker package for hbl lauriya, west champaran, bihar
Design, engineering, manufacturing, supply, supervision for erection and commissioning of jet cooker package for hbl lauriya, west champaran, bihar
Read moreDesign, engg, manufacturing, supply, installation and commissioning of acvs (hvac) system in connection with upgradation of billet casters i and ii at ccp main package (pkg-i)
Design, engg, manufacturing, supply, installation and commissioning of acvs (hvac) system in connection with upgradation of billet casters i and ii at ccp main package (pkg-i)
Read moreNecessary repair work under construction of road under dmft scheme in distt. baran package no. rj-04-dmft/2021-22/31 under the contractor guarantee period
Necessary repair work under construction of road under dmft scheme in distt. baran package no. rj-04-dmft/2021-22/31 under the contractor guarantee period
Read moreOperation and fully comprehensive annual maintenance contract for a c chiller package and connected a c centralised system in high court complex ernakulam for the period of one year from 01-11-2026 to 31-10-2027-amc for a c chiller package 2026-27-
Operation and fully comprehensive annual maintenance contract for a c chiller package and connected a c centralised system in high court complex ernakulam for the period of one year from 01-11-2026 to 31-10-2027
Read moreAnnual maintenance services for water purification and conditioning system (version 2) - as per bid as per bid package-5 : water purifier and conditioning system maintenance involving basic servicing, filters, membranes, all electrical parts includ..
Annual maintenance services for water purification and conditioning system (version 2) - as per bid as per bid package-5 : water purifier and conditioning system maintenance involving basic servicing, filters, membranes, all electrical parts includ..
Read morePart and assembly modelling and two d drawings,specialized design tools for weldments, molds, and sheet metal,design and manufacturability checks,ecad mcad collaboration,intelligent cad libraries of industry-standard fasteners,manufacturing cost analysis,cad standards and drawings checking,electrical harness, piping, tubing, duct design, and surface flattening,integrated virtual companion for mechanical design,integrated virtual companion for knowledge and know-how,linear static analysis for parts and assemblies,time-based motion analysis,real-time cross-team collaboration in the cloud,secure data management version management,additive manufacturing,three axis nc machining and machine simulation,sheet metal nesting and nc programming,augmented reality and virtual reality,photorealistic rendering,training and support
Part and assembly modelling and two d drawings,specialized design tools for weldments, molds, and sheet metal,design and manufacturability checks,ecad mcad collaboration,intelligent cad libraries of industry-standard fasteners,manufacturing cost analysis,cad standards and drawings checking,electrical harness, piping, tubing, duct design, and surface flattening,integrated virtual companion for mechanical design,integrated virtual companion for knowledge and know-how,linear static analysis for parts and assemblies,time-based motion analysis,real-time cross-team collaboration in the cloud,secure data management version management,additive manufacturing,three axis nc machining and machine simulation,sheet metal nesting and nc programming,augmented reality and virtual reality,photorealistic rendering,training and support
Read moreof your Industry type