Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Job Of In Situ Reconditioning Of Cms Crossing &Amp Using Technology Of Translamatic Robotic Welding Reconditioning Of Worn Out 52 Kg And 60 Kg Switch Rail Using Electrodes Approved By Rdso Irs H 3 C Class As Per Standards Prescribed By Rdso As A Complete Job In Identified Yards In The Section Of Sr.Den I, Sr.Den Ii, Den Iii &Amp Sr. Den Hq
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77321921 |
|
Reference Number |
185-2024-25-DEN-Track-FZR |
| Tender Fee | 0 |
| EMD | 2.1 Lakh |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77321921/viewNitPdf_4709742.pdf |
| Start Date | September 11, 2024 16:11 |
| End Date |
Expired
03/10/2024
Expired 742 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reconditioning cms crossing using rdso approved translamatic robotic welding technology under sr den/ratnagiri section
Reconditioning cms crossing using rdso approved translamatic robotic welding technology under sr den/ratnagiri section
Read moreReconditioning of cupped at welds and wheel burns of rails with translamatic robotic technique under sr.den/ratnagiri section
Reconditioning of cupped at welds and wheel burns of rails with translamatic robotic technique under sr.den/ratnagiri section
Read moreUkai songhad-jalgaon section-. reconditioning of cms crossing by using robotic welding technology in connection with sanctioned track work under the jurisdiction of sr. den/east.
Ukai songhad-jalgaon section-. reconditioning of cms crossing by using robotic welding technology in connection with sanctioned track work under the jurisdiction of sr. den/east.
Read moreFlash butt welding of 60 kg/52 kg/90r rails at site using road cum rail mobile flash butt welding plant at different locations under section of sr.den/2/dnr.
Flash butt welding of 60 kg/52 kg/90r rails at site using road cum rail mobile flash butt welding plant at different locations under section of sr.den/2/dnr.
Read moreReconditioning of cms crossing using robotic welding machine on re-bti, rok-bnw & re-sdlp sections in the jurisdiction of den/east under control of aden/bhiwani.
Reconditioning of cms crossing using robotic welding machine on re-bti, rok-bnw & re-sdlp sections in the jurisdiction of den/east under control of aden/bhiwani.
Read moreCarrying out ultrasonic testing of flash butt (fb) welds using phased array ultrasonic testing (paut) on 52 kg cc+8+2t routes and 60 kg, 880 grade rails on 25t routes over eastern railway. issued by rdso/lko with latest guideline
Carrying out ultrasonic testing of flash butt (fb) welds using phased array ultrasonic testing (paut) on 52 kg cc+8+2t routes and 60 kg, 880 grade rails on 25t routes over eastern railway. issued by rdso/lko with latest guideline
Read moreManufacturing & supplying of at welding portion for 60kg/60e1 r 260/52 kg 90 uts rails for using in single shot crucible method and compressed air preheating system of welding under the jurisdiction of den/i/kir.
Manufacturing & supplying of at welding portion for 60kg/60e1 r 260/52 kg 90 uts rails for using in single shot crucible method and compressed air preheating system of welding under the jurisdiction of den/i/kir.
Read moreComplete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Read moreSupply/providing of lpg filled commercial gas cylinders of capacity 19 kg (net weight) for heating purpose during the winter season 2026-27, including all transportation/carriage charges, loading/unloading etc. (complete job) from source of supply to
Supply/providing of lpg filled commercial gas cylinders of capacity 19 kg (net weight) for heating purpose during the winter season 2026-27, including all transportation/carriage charges, loading/unloading etc. (complete job) from source of supply to
Read moreManufacture and supply of complete fitting items for thick web switches 1 in 12 60 kg to rdso drg no.t-6155 conforming to irs specifications t-10-2025 with latest alteration if any, fitting items to be supplied as per annexure
Manufacture and supply of complete fitting items for thick web switches 1 in 12 60 kg to rdso drg no.t-6155 conforming to irs specifications t-10-2025 with latest alteration if any, fitting items to be supplied as per annexure
Read moreof your Industry type