Tender Details
Particulars | Details |
---|---|
Title |
Mw (Cons) Repairs And Reconstruction Of The Approach Steps To The Hill Fort, Udayagiri, Spsr Nellore Dist, Andhra Pradesh
|
Description |
As Per Tender Document
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_ASI_764253_1 |
Reference Number |
34/NIT/2023-24/Amaravati /Ongole Sub circle |
Tender Fee | 0 |
EMD | 1.85 Lakh |
Tender Value | |
Place | O/o The SA, ASI, Amaravati Circle, Vijayawada |
Link | https://eprocure.gov.in |
Start Date | July 28, 2023 23:40 |
End Date |
21/08/2023 ( Expired 629 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Package-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Package-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Read moreStrengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Read moreUpgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreRepairs to sanitary fittings, false ceiling, joinery and other connected misc items of work at af station jaipur
Repairs to sanitary fittings, false ceiling, joinery and other connected misc items of work at af station jaipur
Read moreSpecial repairs to wall paneling, floor and wall of kitchen, hard standing to front approach of community hall at owl estate of msf, ishapore
Special repairs to wall paneling, floor and wall of kitchen, hard standing to front approach of community hall at owl estate of msf, ishapore
Read moreConstruction of approach road, additional approach road and protection work yamuna river bridge malav aligarh
Construction of approach road, additional approach road and protection work of 2-lane bridge at over yamuna river hasanpur district palwal (haryana) to malav -district aligarh (between uttar pradesh) marg in district aligarh (u.p.)
Read moreRehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Read moreRehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Read moreConservation and repairs of bhudargad fort at post peth shivapur, tal bhudargad, dist kolhapur (phase 2)
Conservation and repairs of bhudargad fort, at post peth- shivapur, tal bhudargad, dist kolhapur (phase 2)
Read moreof your Industry type