Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Invitation For Bids: Asphalt Base And Covered Drainage Project 🛣️ The Department Of Military Affairs, Ministry Of Defence, Is Seeking Bids For The Construction Of Asphalt Base And Covered Drainage With A Synthetic Surface 9 Layer, Including Safety Measures. 🏗️ 🗓️ Deadline: May 15, 2024, 2:00 Pm Bidders Must Provide Detailed Proposals Encompassing Material Specifications, Labor Requirements, Project Timelines, And Safety Protocols. Keywords: Asphalt Base, Covered Drainage, Synthetic Surface, Construction, Safety Measures, Ministry Of Defence, Government Tender| Particulars | Details |
|---|---|
| Title |
Material And Labor For Asphalt Base And Covered Drainage With Sump,Synthetic Surface 9 Layer,Safety
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/4688227 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | April 24, 2024 18:56 |
| End Date |
Expired
15/05/2024
Expired 884 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | AMTRACK INTERNATIONAL | - | 04-05-2024 17:46:13 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 2 | ASEL ARS SPORTS PRIVATE LIMITED | - | 14-05-2024 15:06:58 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 3 | CHANDRA SPORTS & GAMES | - | 11-05-2024 00:42:55 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 4 | DUNLOP SURFACE | - | 04-05-2024 17:15:13 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 5 | ESS AAR INFRASTRUCTURE | - | 15-05-2024 12:58:58 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 6 | FIVE RINGS SPORTS | - | 12-05-2024 23:33:20 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 7 | GIRDHARI LAL & SONS SPORTS PRIVATE LIMITED | - | 15-05-2024 13:15:26 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 8 | INDIA SALES CORPORATION | - | 14-05-2024 13:41:24 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 9 | J P Enterprises | - | 14-05-2024 17:05:37 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 10 | JASBIR ENTERPRISES | - | 14-05-2024 16:10:50 | MSE | MII MSE | Disqualified |
| 11 | KHALSA GYMNASTIC WORKS | - | 10-05-2024 17:14:13 | Central / State PSUs | MII MSE | Disqualified |
| 12 | KOXTONS SPORTS EQUIPMENTS PRIVATE LIMITED | - | 13-05-2024 12:07:15 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 13 | KREATIVE INTEGRATORS PRIVATE LIMITED | - | 15-05-2024 12:22:50 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 14 | LOT INTERNATIONAL | - | 11-05-2024 14:30:16 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 15 | M/S HIMANSHU ENTERPRISES | - | 15-05-2024 13:35:57 | MSE | MII MSE | Qualified |
| 16 | M/S NAMAN TRADERS | - | 13-05-2024 20:23:18 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 17 | N.K & BROTHERS | - | 13-05-2024 11:23:27 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 18 | NETWORK INDIA | - | 15-05-2024 11:54:29 | Registered with designated Agency / Authority | MII N/A | Qualified |
| 19 | S.R. ENTERPRISES | - | 13-05-2024 10:29:13 | Central / State PSUs | MII MSE | Qualified |
| 20 | SANYUKT ENTERPRISES | - | 15-05-2024 13:58:20 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 21 | Time Tech Enterprises | - | 15-05-2024 12:43:03 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 22 | TUGANIA INDUSTRIES | - | 15-05-2024 13:37:47 | Registered with designated Agency / Authority | MII MSE | Disqualified |
Base preparation and laying of asphalt base,drainage system,edge wall,digital score board,synthetic surface,basketball court accessories,flood lighting
Base preparation and laying of asphalt base,drainage system,edge wall,digital score board,synthetic surface,basketball court accessories,flood lighting
Read moreWater bound base layer,bituminous layers,synthetic all wreather surface,volleyball court accessories,digital score board with ground cover
Water bound base layer,bituminous layers,synthetic all wreather surface,volleyball court accessories,digital score board with ground cover
Read moreConstruction of synthetic volleyball court,synthetic volleyball court,volleyball court asphalt,volleyball court edge wall,volleyball court drainage system,volleyball court synthetic surface,volleyball court accessories,volleyball court chain link fencing,volleyball court led flood lighting
Construction of synthetic volleyball court,synthetic volleyball court,volleyball court asphalt,volleyball court edge wall,volleyball court drainage system,volleyball court synthetic surface,volleyball court accessories,volleyball court chain link fencing,volleyball court led flood lighting
Read moreSite preparation and cleaning,earthwork and sub base repair,repair of water bound macadam layer,repair of asphalt or hot mix base,crack filling and surface leveling,repair of resurfacing of synthetic basketball court,synthetic surface coating system,basketball court line marking,repair of basketball backboards,repair of basketball hoops and nets,repair of basketball pole and supporting structure,drainage repair,water remover roller repair,repair of periphery or surrounding area,repair of surface colour and finish,final cleaning and finishing
Site preparation and cleaning,earthwork and sub base repair,repair of water bound macadam layer,repair of asphalt or hot mix base,crack filling and surface leveling,repair of resurfacing of synthetic basketball court,synthetic surface coating system,basketball court line marking,repair of basketball backboards,repair of basketball hoops and nets,repair of basketball pole and supporting structure,drainage repair,water remover roller repair,repair of periphery or surrounding area,repair of surface colour and finish,final cleaning and finishing
Read moreSite preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing
Site preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing
Read moreLine interactive ups with avr (v2),providing and fixing outdoor asphalt base for synthetic surface basketball court,providing and fixing 8 layers cushion kdf material,court line marking,flood light led 100 watt fixture,basketball pole and accessories,drain system,digital board
Line interactive ups with avr (v2),providing and fixing outdoor asphalt base for synthetic surface basketball court,providing and fixing 8 layers cushion kdf material,court line marking,flood light led 100 watt fixture,basketball pole and accessories,drain system,digital board
Read moreMaterial and labour for concrete base 98 by 54 ft,all weather acrylic synthetic surfacing turf 94 by 50 ft 8 layer cushion,movable volleyball poles,volleyball antenna,digital scoreboard,volleyball net made of heavy synthetic,volleyball,chain locking fencing with gate,flood lighting
Material and labour for concrete base 98 by 54 ft,all weather acrylic synthetic surfacing turf 94 by 50 ft 8 layer cushion,movable volleyball poles,volleyball antenna,digital scoreboard,volleyball net made of heavy synthetic,volleyball,chain locking fencing with gate,flood lighting
Read moreCivil work of floor 6 inches thick asphalt base with toe wall and drainage system,8 layers acrylic flooring for lawn tennis court, itf approved,fixed lawn tennis post with net complete,three seater iron bench,plastic chair
Civil work of floor 6 inches thick asphalt base with toe wall and drainage system,8 layers acrylic flooring for lawn tennis court, itf approved,fixed lawn tennis post with net complete,three seater iron bench,plastic chair
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreSite preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work
Site preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work
Read moreof your Industry type