Tender Details

About Tender

🛣️ Invitation For Bids: Asphalt Base And Covered Drainage Project 🛣️ The Department Of Military Affairs, Ministry Of Defence, Is Seeking Bids For The Construction Of Asphalt Base And Covered Drainage With A Synthetic Surface 9 Layer, Including Safety Measures. 🏗️ 🗓️ Deadline: May 15, 2024, 2:00 Pm Bidders Must Provide Detailed Proposals Encompassing Material Specifications, Labor Requirements, Project Timelines, And Safety Protocols. Keywords: Asphalt Base, Covered Drainage, Synthetic Surface, Construction, Safety Measures, Ministry Of Defence, Government Tender
Particulars Details
Title
Material And Labor For Asphalt Base And Covered Drainage With Sump,Synthetic Surface 9 Layer,Safety
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2024/B/4688227
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date April 24, 2024 18:56
End Date
Expired 15/05/2024

Expired 884 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On EMD Status MSE/MII Status Status
1 AMTRACK INTERNATIONAL - 04-05-2024 17:46:13 Registered with designated Agency / Authority MII MSE Disqualified
2 ASEL ARS SPORTS PRIVATE LIMITED - 14-05-2024 15:06:58 Registered with designated Agency / Authority MII MSE Qualified
3 CHANDRA SPORTS & GAMES - 11-05-2024 00:42:55 Registered with designated Agency / Authority MII MSE Disqualified
4 DUNLOP SURFACE - 04-05-2024 17:15:13 Registered with designated Agency / Authority MII MSE Disqualified
5 ESS AAR INFRASTRUCTURE - 15-05-2024 12:58:58 Registered with designated Agency / Authority MII MSE Qualified
6 FIVE RINGS SPORTS - 12-05-2024 23:33:20 Registered with designated Agency / Authority MII MSE Disqualified
7 GIRDHARI LAL & SONS SPORTS PRIVATE LIMITED - 15-05-2024 13:15:26 Registered with designated Agency / Authority MII MSE Qualified
8 INDIA SALES CORPORATION - 14-05-2024 13:41:24 Registered with designated Agency / Authority MII MSE Qualified
9 J P Enterprises - 14-05-2024 17:05:37 Registered with designated Agency / Authority MII MSE Disqualified
10 JASBIR ENTERPRISES - 14-05-2024 16:10:50 MSE MII MSE Disqualified
11 KHALSA GYMNASTIC WORKS - 10-05-2024 17:14:13 Central / State PSUs MII MSE Disqualified
12 KOXTONS SPORTS EQUIPMENTS PRIVATE LIMITED - 13-05-2024 12:07:15 Registered with designated Agency / Authority MII MSE Qualified
13 KREATIVE INTEGRATORS PRIVATE LIMITED - 15-05-2024 12:22:50 Registered with designated Agency / Authority MII MSE Qualified
14 LOT INTERNATIONAL - 11-05-2024 14:30:16 Registered with designated Agency / Authority MII MSE Qualified
15 M/S HIMANSHU ENTERPRISES - 15-05-2024 13:35:57 MSE MII MSE Qualified
16 M/S NAMAN TRADERS - 13-05-2024 20:23:18 Registered with designated Agency / Authority MII MSE Disqualified
17 N.K & BROTHERS - 13-05-2024 11:23:27 Registered with designated Agency / Authority MII MSE Qualified
18 NETWORK INDIA - 15-05-2024 11:54:29 Registered with designated Agency / Authority MII N/A Qualified
19 S.R. ENTERPRISES - 13-05-2024 10:29:13 Central / State PSUs MII MSE Qualified
20 SANYUKT ENTERPRISES - 15-05-2024 13:58:20 Registered with designated Agency / Authority MII MSE Disqualified
21 Time Tech Enterprises - 15-05-2024 12:43:03 Registered with designated Agency / Authority MII MSE Disqualified
22 TUGANIA INDUSTRIES - 15-05-2024 13:37:47 Registered with designated Agency / Authority MII MSE Disqualified
Similar Tenders
Base preparation and laying of asphalt base,drainage system,edge wall,digital score board,synthetic surface,basketball court accessories,flood lighting

Base preparation and laying of asphalt base,drainage system,edge wall,digital score board,synthetic surface,basketball court accessories,flood lighting

Read more
Water bound base layer,bituminous layers,synthetic all wreather surface,volleyball court accessories,digital score board with ground cover

Water bound base layer,bituminous layers,synthetic all wreather surface,volleyball court accessories,digital score board with ground cover

Read more
Construction of synthetic volleyball court,synthetic volleyball court,volleyball court asphalt,volleyball court edge wall,volleyball court drainage system,volleyball court synthetic surface,volleyball court accessories,volleyball court chain link fencing,volleyball court led flood lighting

Construction of synthetic volleyball court,synthetic volleyball court,volleyball court asphalt,volleyball court edge wall,volleyball court drainage system,volleyball court synthetic surface,volleyball court accessories,volleyball court chain link fencing,volleyball court led flood lighting

Read more
Site preparation and cleaning,earthwork and sub base repair,repair of water bound macadam layer,repair of asphalt or hot mix base,crack filling and surface leveling,repair of resurfacing of synthetic basketball court,synthetic surface coating system,basketball court line marking,repair of basketball backboards,repair of basketball hoops and nets,repair of basketball pole and supporting structure,drainage repair,water remover roller repair,repair of periphery or surrounding area,repair of surface colour and finish,final cleaning and finishing

Site preparation and cleaning,earthwork and sub base repair,repair of water bound macadam layer,repair of asphalt or hot mix base,crack filling and surface leveling,repair of resurfacing of synthetic basketball court,synthetic surface coating system,basketball court line marking,repair of basketball backboards,repair of basketball hoops and nets,repair of basketball pole and supporting structure,drainage repair,water remover roller repair,repair of periphery or surrounding area,repair of surface colour and finish,final cleaning and finishing

Read more
Site preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing

Site preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing

Read more
Line interactive ups with avr (v2),providing and fixing outdoor asphalt base for synthetic surface basketball court,providing and fixing 8 layers cushion kdf material,court line marking,flood light led 100 watt fixture,basketball pole and accessories,drain system,digital board

Line interactive ups with avr (v2),providing and fixing outdoor asphalt base for synthetic surface basketball court,providing and fixing 8 layers cushion kdf material,court line marking,flood light led 100 watt fixture,basketball pole and accessories,drain system,digital board

Read more
Material and labour for concrete base 98 by 54 ft,all weather acrylic synthetic surfacing turf 94 by 50 ft 8 layer cushion,movable volleyball poles,volleyball antenna,digital scoreboard,volleyball net made of heavy synthetic,volleyball,chain locking fencing with gate,flood lighting

Material and labour for concrete base 98 by 54 ft,all weather acrylic synthetic surfacing turf 94 by 50 ft 8 layer cushion,movable volleyball poles,volleyball antenna,digital scoreboard,volleyball net made of heavy synthetic,volleyball,chain locking fencing with gate,flood lighting

Read more
Civil work of floor 6 inches thick asphalt base with toe wall and drainage system,8 layers acrylic flooring for lawn tennis court, itf approved,fixed lawn tennis post with net complete,three seater iron bench,plastic chair

Civil work of floor 6 inches thick asphalt base with toe wall and drainage system,8 layers acrylic flooring for lawn tennis court, itf approved,fixed lawn tennis post with net complete,three seater iron bench,plastic chair

Read more
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Read more
Site preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work

Site preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise