Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Of Complete Overhauling And Repairing Of Main Pump Set
|
| Description |
Work Of Complete Overhauling And Repairing Of Main Pump Set &Amp#X0d
Nos. 201, 202, And 203 Along With Allied Works At Harvey Road &Amp#X0d
Pumping Station
|
| Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
| Tender Id | 2025_MCGM_1180952_1 |
|
Reference Number |
Work of Complete overhauling and repairing of Main Pump no 201,202 and 203 along with allied wor |
| Tender Fee | 929 |
| EMD | 3000 |
| Tender Value | - |
| Place | Harvey Road Pumping Station |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2050128 |
| Start Date | May 16, 2025 23:00 |
| End Date |
Expired
22/05/2025
Expired 507 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreTggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Tggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Read moreSupply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Supply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Read moreBmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Bmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Read moreUnder the bettiah municipal corporation (ward no. 18), the project involves the renovation and construction of drains—complete with covering slabs—along two stretches: from behind the late ramprasad malik's house to behind bablu malik's house, and from behind jwala malik's house to bagad malik's house. additionally, culverts are to be constructed at three locations: near bablu malik's house and near chudihar pandit ji's house.
Under the bettiah municipal corporation (ward no. 18), the project involves the renovation and construction of drains—complete with covering slabs—along two stretches: from behind the late ramprasad malik's house to behind bablu malik's house, and from behind jwala malik's house to bagad malik's house. additionally, culverts are to be constructed at three locations: near bablu malik's house and near chudihar pandit ji's house.
Read moreOperation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary
Operation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge.
Read moreProviding,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of
Providing,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger
Read moreof your Industry type