Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mirror Complete For Lhb Slr Amrit Bharat
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106475376 |
|
Reference Number |
12241359A |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/092024/106475376/viewNitPdf_4718202.pdf |
| Start Date | September 17, 2024 23:02 |
| End Date |
Expired
30/09/2024
Expired 741 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of rear view mirror for non costcap shovels, 75t and 40t cranes and 12t cranes working at rgocp-iii, rg-ii area
Procurement of rear view mirror for non costcap shovels, 75t and 40t cranes and 12t cranes working at rgocp-iii, rg-ii area
Read moreImprovement and strengthening of processing units by providing necessary arrangements/repairs at 10 mld stp at peddacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Improvement and strengthening of processing units by providing necessary arrangements/repairs at 10 mld stp at peddacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Read moreTggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreImprovement of operational efficiency of stp units by providing necessary items at various components at 0.6 mld stp at safilguda as part of 2nd phase of jal hi amrit reforms incentive utilization of stps under amrut 2.0 under sd-ii, project division no.-i
Improvement of operational efficiency of stp units by providing necessary items at various components at 0.6 mld stp at safilguda as part of 2nd phase of jal hi amrit reforms incentive utilization of stps under amrut 2.0 under sd-ii, project division no.-i
Read moreProviding necessary mechanical equipments for aeration unit and components/items in main electrical panels etc to improve operational and energy efficiency of 30 mld stp nallacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Providing necessary mechanical equipments for aeration unit and components/items in main electrical panels etc to improve operational and energy efficiency of 30 mld stp nallacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Read moreSupply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Supply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Read moreUnder the bettiah municipal corporation (ward no. 18), the project involves the renovation and construction of drains—complete with covering slabs—along two stretches: from behind the late ramprasad malik's house to behind bablu malik's house, and from behind jwala malik's house to bagad malik's house. additionally, culverts are to be constructed at three locations: near bablu malik's house and near chudihar pandit ji's house.
Under the bettiah municipal corporation (ward no. 18), the project involves the renovation and construction of drains—complete with covering slabs—along two stretches: from behind the late ramprasad malik's house to behind bablu malik's house, and from behind jwala malik's house to bagad malik's house. additionally, culverts are to be constructed at three locations: near bablu malik's house and near chudihar pandit ji's house.
Read moreProviding,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of
Providing,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger
Read moreMirror complete for lhb slr amrit bharat
For complete deion and other details, please refer to tender
Read moreMirror complete for lhb slr amrit bharat
For complete deion and other details, please refer to tender
Read moreof your Industry type