Tender Details
Particulars | Details |
---|---|
Title |
Provision Of Additional Side Pathway On Br.No. 835/2 ,.836/1 &Amp Br.No.802/1 Dn And Wider Platform On Pier/Abutment On Br.No. 835/2 &Amp Br.No.836/1 On Et Amf Of Nagpur Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76786827 |
Reference Number |
CR-BrMMR072024-2025 |
Tender Fee | 0 |
EMD | 3.13 Lakh |
Tender Value | |
Place | Mumbai CST |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/76786827/viewNitPdf_4677113.pdf |
Start Date | September 19, 2024 20:41 |
End Date |
23/10/2024 ( Expired 201 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Zone-1 chhata ward no.-65 belanganj yamuna kinara road, construction of side track and drain on one side and repair work including laying of precast.
Zone-1 chhata ward no.-65 belanganj yamuna kinara road, construction of side track and drain on one side and repair work including laying of precast.&#x0d
Read more1 drilling of borewell and erecting of power pump 2) providing and erecting of power pump on ex borewell at kalamba tq basmath dist hingoli
1 drilling of borewell and erecting of power pump 2) providing and erecting of power pump on ex borewell at kalamba tq basmath dist hingoli&#x0d &#x0d
Read moreRepair and routine maintenance of roads under performance based maintenance stage contract 2025-26 of randb sub division bandipora and sub division aloosa. 1. block bandipora 2. block arin 3. block aloosa 4. block bankoot.
Repair and routine maintenance of roads under performance based maintenance stage contract 2025-26 of randb sub division bandipora and sub division aloosa.&#x0d 1. block bandipora&#x0d 2. block arin &#x0d 3. block aloosa &#x0d 4. block bankoot.&#x0d
Read moreDemolltion and reconstructlon of storm water drain of size 1.20x1.20m at valayapathi salai r-1, valayapathi salai r-2(0.9mx0.9m) and burner salai (0.6mx0.75m) in dn.93, unit.20 zone 7, package - 12
Demolltion and reconstructlon of storm water drain of size 1.20x1.20m at valayapathi salai r-1, valayapathi salai r-2(0.9mx0.9m) and burner salai (0.6mx0.75m) in dn.93, unit.20 zone 7, package - 12&#x0d
Read moreAnnual maintanance operation and repair of electrical installation having 1 street light 2 diesel generator set 100 kva 02 nos 3 amf panel 02 nos 4 dewatering of water gallary on daily basis 5 dewatering pumps 3 x 5 hp 6 supply to dam gate 7 ic
Annual maintanance operation and repair of electrical installation having 1 street light 2 diesel generator set 100 kva 02 nos 3 amf panel 02 nos 4 dewatering of water gallary on daily basis 5 dewatering pumps 3 x 5 hp 6 supply to dam gate 7 ic
Read moreConstruction of roads, drains and widening of road no. 3, road no. 2, plot no. 14/5 to 18/1/6, and sub division roads of plot no.1 at i.a. south side g.t. road distt ghaziabad.
Construction of roads, drains and widening of road no. 3, road no. 2, plot no. 14/5 to 18/1/6, and sub division roads of plot no.1 at i.a. south side g.t. road distt ghaziabad.
Read moreProviding non air condition vehicle like maruti ertiga / hundai aura / xcent / maruti swift / honda amaze / maruti celorio on hire basis for the mjp wm division, ambernath / mjp wm sub division, ambernath and badlapur for the period of 2 years
Providing non air condition vehicle like maruti ertiga / hundai aura / &#x0d xcent / maruti swift / honda amaze / maruti celorio on hire basis for the &#x0d mjp wm division, ambernath / mjp wm sub division, ambernath and&#x0d badlapur for the period of 2 year
Read moreSewer line construction work in gurudev vihar colony, near aarti fancy store, lane number 1 and 2 on the right side of sikar road, lane number 2 on the left side ward no. 03
Sewer line construction work in gurudev vihar colony, near aarti fancy store, lane number 1 and 2 on the right side of sikar road, lane number 2 on the left side ward no. 03
Read moreRepair work of hoist of cr gate 2 no.and hr gate 1 no. at 41/180km on dhom lbc and motarization of gate for operation and allied work under control of satara irrigation division satara.
&#x0d repair work of hoist of cr gate 2 no.and hr gate 1 no. at 41/180km on dhom lbc and motarization of gate for operation and allied work under control of satara irrigation division satara.&#x0d
Read moreRebuild ph sub division manjei automation of vertical turbine pumps in kwa implementation of phase 1 (stage 2) part under rebuild kerala initiative arwss to amarambalam pump house 75hp (2 nos) supplying and installation of automation system
Rebuild ph sub division manjei automation of vertical turbine pumps in kwa&#x0d implementation of phase 1 (stage 2) part under rebuild kerala initiative&#x0d arwss to amarambalam pump house 75hp (2 nos) supplying and installation&#x0d of automation system
Read moreof your Industry type