Tender Details

Particulars Details
Title
Renewal Work Of Jaipur Jobner Nagaur Bot Road Km. 18/200 To Km. 63/200 (Kalwar To Bhatipura Section Except Cc Portion)
Description
Renewal Work Of Jaipur Jobner Nagaur Bot Road Km. 18/200 To Km. 63/200 (Kalwar To Bhatipura Section Except Cc Portion)
Organisation RSRDCC-GM | State Govt. and UT
Tender Id 2025_RSRDC_470210_1
Reference
Number
RSRDCC NIT 091/2025-26 DATED 14.05.2025 Sl No 1
Tender Fee 14300
EMD 34 Lakh
Tender Value
Place Jaipur Jobner Nagaur Road
Link https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=841869
Start Date May 29, 2025 16:30
End Date

09/06/2025 ( Expired 14 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Read more
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Read more
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 from km 113.25 to 160.75 47.500 km

Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 from km 113.25 to 160.75 47.500 km

Read more
Consultancy services for authoritys engineer for supervision of construction of road from taliha to tato section of frontier highway nh-913 km 87.13 to 121.541 34.411km

Consultancy services for authoritys engineer for supervision of construction of road from taliha to tato section of frontier highway nh-913 km 87.13 to 121.541 34.411km

Read more
Consultancy services for authoritys engineer for supervision of construction of road from taliha to tato section of frontier highway nh 913 km 0.00 to 60.25 60.25km

Consultancy services for authoritys engineer for supervision of construction of road from taliha to tato section of frontier highway nh 913 km 0.00 to 60.25 60.25km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise