Tender Details
Particulars | Details |
---|---|
Title |
Patch Repair Work On Jaipur Nagaur Road Km 63/200 To 101/700 And 113/00 To 190/00 (Sh 90 Two Lane Bot Road) Under Sdrf
|
Description |
Patch Repair Work On Jaipur Nagaur Road Km 63/200 To 101/700 And 113/00 To 190/00 (Sh 90 Two Lane Bot Road) Under Sdrf
|
Organisation | RSRDCC-GM | State Govt. and UT |
Tender Id | 2024_RSRDC_428665_1 |
Reference Number |
RSRDCC NIT 283/2024-25 DATED 21.10.2024 Sl No 1 |
Tender Fee | 4360 |
EMD | 2.31 Lakh |
Tender Value | |
Place | Jaipur-Nagaur Road |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=770812 |
Start Date | October 23, 2024 20:30 |
End Date |
29/10/2024 ( Expired 200 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreUpgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreRehabilitation and up-gradation from single lane to two lane with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode
Rehabilitation and up-gradation from single lane to two lane with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for kesla fp at km 198.967 for the work of rehabilitation and up-gradation of nh-200 from design ch.178.944 to 241.533 to 2-lane with paved shoulder in chhattisgarh
Engagement of user fee collection agency on the basis of cb through e-tender for kesla fp at km 198.967 for the work of rehabilitation and up-gradation of nh-200 from design ch.178.944 to 241.533 to 2-lane with paved shoulder in chhattisgarh
Read moreProtection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreof your Industry type