Tender Details
Particulars | Details |
---|---|
Title |
Horticulture And Landscape Works (With 02 Years Maintenance) For Rotary No. 1 And 2 At I.A. Trans Ganga City Unnao.
|
Description |
Horticulture And Landscape Works (With 02 Years Maintenance) For Rotary No. 1 And 2 At I.A. Trans Ganga City Unnao.
|
Organisation | UP STATE INDUSTRIAL DEVELOPMENT CORPORATION | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2977 |
EMD | 1.05 Lakh |
Tender Value | |
Place | tgc unnao |
Link |
AAAAAAAAAA Login to view |
Start Date | May 29, 2025 20:30 |
End Date |
19/06/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Read moreConstruction of engineering hall-1 (back-end facility for lwr - llwmp)
Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreKmda/gap/se(n)/niq-03(2nd call)/25-26 sl no 02
Preparation of gis based detailed project report (dpr) for pollution abatement sewerage project (interception&#x0d and di with stp/fstp) at uluberia municipal town in west bengal.
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreRequest for information (rfi) camc for pilatus (pc7 mk-ii) simulators and associated equipments installed at afa dundigal and afs tambaram for period of five years along with obsolescence management (if any)
Request for information (rfi) camc for pilatus (pc7 mk-ii) simulators and associated equipments installed at afa dundigal and afs tambaram for period of five years along with obsolescence management (if any)
Read moreHiring services 1 number brand new tata 407 gold sfc dcr33hsd 2wd bs6 2 at plm department ps5 noonmati for a period of four years
Hiring services 1 number brand new tata 407 gold sfc dcr33hsd 2wd bs6 2 at plm department ps5 noonmati for a period of four years
Read moreConstruction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park along with fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under barasat highway division no.-i in the district of north
Construction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under bhd no.-i in n 24pgs ei work for compound illu and beau.
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreof your Industry type