Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Invitation For Proposal: Construction Of Railway Under Bridge (Rub) 🌉 The Ministry Of Railways, Central Government, Invites Proposals For The Construction Of A Railway Under Bridge (Rub) At Km 38/12 13 On The Marpalli Kohir Section, Secunderabad, In Place Of The Existing Lane Closure (Lc No.20(m)). The Construction Method To Be Employed Is The Air Pushing Method Using A Rh Girder. 📅 Proposal Submission Deadline: June 19, 2024, 2:00 Pm Interested Contractors Must Submit A Detailed Proposal, Including Technical Specifications, Methodology, And Financial Bids, Along With An Earnest Money Deposit (Emd) Of Inr 6,00,200. Keywords: Railway Under Bridge, Construction, Ministry Of Railways, Central Government, Air Pushing Method, Rh Girder, Earnest Money Deposit, Tender| Particulars | Details |
|---|---|
| Title |
Sc Division: Vkb Prli Section Proposal For Construction Of Rub In Lieu Of Lc No.20(m) At Km 38/ 12 13 Between Marpalli Kohir Stations. (By Air Pushing Method Using Rh Girder)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75057577 |
|
Reference Number |
49_W_SC_24_OT |
| Tender Fee | 0 |
| EMD | 6 Lakh |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/062024/75057577/viewNitPdf_4566558.pdf |
| Start Date | May 28, 2024 23:48 |
| End Date |
Expired
19/06/2024
Expired 808 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sc division: vkb-prli section -proposal for construction of rub in lieu of lc no.8(m) at km.10/5-6 between vikarabad - sadashivpet stations. (by air pushing method using rh girder)
For complete deion and other details, please refer to tender
Read moreName of the work: - sw-i: vkb-prli section provision of additional three loop lines at marpalli station on vikarabad-parli section (track works), sw-ii: vkb-prli section- construction of station building and platform at marpalli station & sw-iii: vkb-prli section: bridge no.59 at km.36/4-5 exg. 2x0.91m rcc slab between marpalli-kohir stations. proposed extension as 1x2.50mx1.20m rcc box by cast-in-situ method & bridge no.60 at km.36/8-9 exg. 3x2.75mx1.20m rcc box between marpalli-kohir
For complete deion and other details, please refer to tender
Read moreSw 1) vkb-prli section: proposal for construction of rub no. 263a at km. 256/7-8 (trespassing location) between ghatnandur - parli vaijnath stations (by air pushing method using rh girder). sw 2) vkb-prli section: proposal for construction of rub no. 99a at km. 71/2-3 (trespassing location) between zahirabad - matalkunta stations (by air pushing method using rh girder). (two packet system).
For complete deion and other details, please refer to tender
Read moreVkb-prli section: proposal for construction of rub in lieu of lc no. 39 (m) at km. 82/11-12 between matlakunta - bidar stations. (using cut & air pulling method).
For complete deion and other details, please refer to tender
Read moreVkb-prli section: proposal for construction of rub in lieu of lc no 60 (m) at km. 118/13-14 between halbarga - bhalki stations.
For complete deion and other details, please refer to tender
Read more1) amla-chhindwara section- construction of rub by pushing/sliding method in lieu of lc no. ap-4 c class km 880.141. 2) amla-chhindwara section- construction of rub by pushing/sliding method in lieu of lc no pc-20 c class km 988.088.
For complete deion and other details, please refer to tender
Read moreAmravati-narkhed section - construction of rub by pushing/sliding method in lieu of 1.lc no.50 km. 767.869 2.lc no.59 km. 797.915
For complete deion and other details, please refer to tender
Read moreAmravati-narkhed section - construction of rub by pushing/sliding method in lieu of 1.lc no.55 km. 779.281 2.lc no.56 km. 779.950
For complete deion and other details, please refer to tender
Read moreHyb division: - elimination of manned lc no 66 by providing rub (air pushing method) on sc-dhne section.
For complete deion and other details, please refer to tender
Read moreRatlam-khandwa section : construction of subway (rub) in lieu of lc no. 240(km: 482/14-15) by ing relieving girder and laying the box(es) by pushing the box below the relieving girder.
For complete deion and other details, please refer to tender
Read moreof your Industry type