Tender Details

Particulars Details
Title

AAAAAAAAAA

Login to view
Description
Completion Of Balance Work Of Inland Waterway Terminal At Jogighopa At Risk And Cost Of Epc Contractor In The State Of Assam In The Year 2025 26
Organisation National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 11800
EMD 2.68 Lakh
Tender Value
Place Assam
Link

AAAAAAAAAA

Login to view
Start Date June 26, 2025 19:30
End Date

05/07/2025 ( 0 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more

Construction of septic tank behind typer-iii qtr. no. ac-01 to 06 (05 users), construction of inspection chamber for sewage line of type-i qtr. and special repair work of typer-iii, type-ii and type-i block at alhw residential colony, brookshabad in

Read more
Balance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.

Balance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.

Read more
Ca no cweafj-10/2025-26 repair to premix carpet of roads in tech area connecting to runway / dispersal / link / taxi track / sga / domestic and otm area at af station udhampur under ge af udhampur.

Ca no cweafj-10/2025-26 repair to premix carpet of roads in tech area connecting to runway / dispersal / link / taxi track / sga / domestic and otm area at af station udhampur under ge af udhampur.

Read more

Construction of paver block road with cross drainage work and protection work from rajani barman house to latkobari pwd road via khatamari bazar to rejaul alam house and bhabesh barman house, under chowdhurihat g.p at dinhata- ii block in the distric

Read more
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Annual maintenance and repair of colony roads at madhuban area along with the main road from atharabanki to police station square for the year 2025-26

Annual maintenance and repair of colony roads at madhuban area along with the main road from atharabanki to police station square for the year 2025-26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise