Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening To 4 Lane Ps From Km 347.500 Intersection With Nh 48 At Km 116.800 Near Sira To Km 367.700 Near Badavanahalli Including Bypass To Sira Town Of Nh 69 In The State Of Karnataka On Epc Mode Under Annual Plan 2024 25
|
| Description |
Widening To 4 Lane Ps From Km 347.500 Intersection With Nh 48 At Km 116.800 Near Sira To Km 367.700 Near Badavanahalli Including Bypass To Sira Town Of Nh 69 In The State Of Karnataka On Epc Mode Under Annual Plan 2024 25
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_875524_1 |
|
Reference Number |
RW/BNG /NH-69/Km.347 500-367 700/03/2024 |
| Tender Fee | 47200 |
| EMD | 3.73 Crore |
| Tender Value | |
| Place | Near Sira to Near Badavanahalli |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=920350 |
| Start Date | September 01, 2025 22:30 |
| End Date |
Expired
15/10/2025
Expired 262 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreWidening to 4 lane paved shoulder from km. 111.500 to 148.088 on nh 69 old nh 206 honnachittoor section in the state of karnataka on epc mode
Widening to 4 lane paved shoulder from km. 111.500 to 148.088 on nh 69 old nh 206 honnachittoor section in the state of karnataka on epc mode
Read moreWidening to 4 lane paved shoulder from km 111.5 to 148.088 on nh 69 old nh 206 honnavar chittoor section in the state of karnataka on epc mode
Widening to 4 lane paved shoulder from km 111.5 to 148.088 on nh 69 old nh 206 honnavar chittoor section in the state of karnataka on epc mode
Read moreConstruction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode
Construction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode
Read moreConstruction of 4 lane bypass to ras town on nh 158 in the state of rajasthan on epc mode
Construction of 4 lane bypass to ras town on nh 158 in the state of rajasthan on epc mode
Read moreWidening to 2 lane with ps from km 67 to 115 on kadur hosadurga section of nh 173 in the state of karnataka on epc mode
Widening to 2 lane with ps from km 67 to 115 on kadur hosadurga section of nh 173 in the state of karnataka on epc mode
Read moreConstruction of 4 lane ps from km 140.200 to 167.326 chikkodi gotur section including chikkodi bypass on nh 548b in the state of karnataka on hybrid annuity mode ham under nho annual plan 2023 24
Construction of 4 lane ps from km 140.200 to 167.326 chikkodi gotur section including chikkodi bypass on nh 548b in the state of karnataka on hybrid annuity mode ham under nho annual plan 2023 24
Read moreConstruction of additional 2 lane rob near hangarahalli from km 79.830 to km 80.650 on nh 373 in the state of karnataka on epc mode
Construction of additional 2 lane rob near hangarahalli from km 79.830 to km 80.650 on nh 373 in the state of karnataka on epc mode
Read moreof your Industry type