Tender Details

Particulars Details
Title
Widening To 4 Lane Ps From Km 347.500 Intersection With Nh 48 At Km 116.800 Near Sira To Km 367.700 Near Badavanahalli Including Bypass To Sira Town Of Nh 69 In The State Of Karnataka On Epc Mode Under Annual Plan 2024 25
Description
Widening To 4 Lane Ps From Km 347.500 Intersection With Nh 48 At Km 116.800 Near Sira To Km 367.700 Near Badavanahalli Including Bypass To Sira Town Of Nh 69 In The State Of Karnataka On Epc Mode Under Annual Plan 2024 25
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2025_MoRTH_875524_1
Reference
Number
RW/BNG /NH-69/Km.347 500-367 700/03/2024
Tender Fee 47200
EMD 3.73 Crore
Tender Value
Place Near Sira to Near Badavanahalli
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=920350

Start Date September 01, 2025 22:30
End Date
Expired 15/10/2025

Expired 262 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Widening to 4 lane paved shoulder from km. 111.500 to 148.088 on nh 69 old nh 206 honnachittoor section in the state of karnataka on epc mode

Widening to 4 lane paved shoulder from km. 111.500 to 148.088 on nh 69 old nh 206 honnachittoor section in the state of karnataka on epc mode

Read more
Widening to 4 lane paved shoulder from km 111.5 to 148.088 on nh 69 old nh 206 honnavar chittoor section in the state of karnataka on epc mode

Widening to 4 lane paved shoulder from km 111.5 to 148.088 on nh 69 old nh 206 honnavar chittoor section in the state of karnataka on epc mode

Read more
Construction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode

Construction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode

Read more
Construction of 4 lane bypass to ras town on nh 158 in the state of rajasthan on epc mode

Construction of 4 lane bypass to ras town on nh 158 in the state of rajasthan on epc mode

Read more
Widening to 2 lane with ps from km 67 to 115 on kadur hosadurga section of nh 173 in the state of karnataka on epc mode

Widening to 2 lane with ps from km 67 to 115 on kadur hosadurga section of nh 173 in the state of karnataka on epc mode

Read more
Construction of 4 lane ps from km 140.200 to 167.326 chikkodi gotur section including chikkodi bypass on nh 548b in the state of karnataka on hybrid annuity mode ham under nho annual plan 2023 24

Construction of 4 lane ps from km 140.200 to 167.326 chikkodi gotur section including chikkodi bypass on nh 548b in the state of karnataka on hybrid annuity mode ham under nho annual plan 2023 24

Read more
Construction of additional 2 lane rob near hangarahalli from km 79.830 to km 80.650 on nh 373 in the state of karnataka on epc mode

Construction of additional 2 lane rob near hangarahalli from km 79.830 to km 80.650 on nh 373 in the state of karnataka on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise