Tender Details
Particulars | Details |
---|---|
Title |
Wbpw(r)d/Nit 03 Of Se/Whc I/2024 2025/1
|
Description |
Attagarh Saktigarh Road, From 0.00 Kmp To 3.00 Kmp, Strengthening Work Under Burdwan South Highway Division In The District Of Purba Bardhaman.
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2025_WBPWD_797662_1 |
Reference Number |
WBPW(R)D/NIT- 03 of SE/WHC-I/2024-2025 |
Tender Fee | 0 |
EMD | 4.45 Lakh |
Tender Value | |
Place | Burdwan |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1770069 |
Start Date | January 15, 2025 20:30 |
End Date |
05/02/2025 ( Expired 127 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConsultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to
Consultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to
Read moreConsultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km
Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km
Read moreConsultancy services for authoritys engineer for supervision of construction of road from taliha to tato section of frontier highway nh 913 km 0.00 to 60.25 60.25km
Consultancy services for authoritys engineer for supervision of construction of road from taliha to tato section of frontier highway nh 913 km 0.00 to 60.25 60.25km
Read moreConsultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km
Read moreConstr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Read moreConstruction of mipi-andrathang road from km 20.000 to 50.000
Construction of mipi-andrathang road from km 20.000 to 50.000
 (design length 34.880 km between km 20.000 to 54.880)green field
 alignment to nhsl specifications in the aor of 62 rcc under 752 brtf
 of project udayak in arunachal pradesh state
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreDevelop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Develop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Read moreof your Industry type