Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Urgent Infrastructure Project Opportunity At Indian Oil 🏭 Indian Oil, A Central Government Ministry/Department, Is Seeking Bids For The Critical Project Involving The Laying Of An 18 Inch Bypass Pipe To Address A Leak In The Fo Jetty Pipeline Section At Paradeep, Jagatsinghpur. 🛢️ 📅 Bid Submission Deadline: April 06, 2024, 6:00 Pm This Project Will Be Executed Through Both Open Cut And Horizontal Directional Drilling (Hdd) Methods. Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Methodology, And Cost Estimates, By The Specified Deadline. Keywords: Indian Oil, Infrastructure Project, Pipeline Repair, Bypass Pipe, Open Cut, Hdd, Paradeep Jagatsinghpur, Government Tender| Particulars | Details |
|---|---|
| Title |
Laying Of 18 Inch Bypass Pipe For Leaky Fo Jetty Pipeline Section Through Both Open Cut And Hdd At Paradeep
|
| Description |
Laying Of 18 Inch Bypass Pipe For Leaky Fo Jetty Pipeline Section Through Both Open Cut And Hdd At Paradeep
|
| Organisation | IndianOil | Central Govt. Ministry/Department |
| Tender Id | 2024_OSO_176329_1 |
|
Reference Number |
OSO/ENG/2023-24/LT-17 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Paradeep Jagatsinghpur |
| Link |
View Original Tender Notice
https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=186502 |
| Start Date | March 30, 2024 14:30 |
| End Date |
Expired
06/04/2024
Expired 887 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Two hot tappings at leaky fo jetty pipeline near ppa gate 1 paradeep
Two hot tappings at leaky fo jetty pipeline near ppa gate 1 paradeep
Read moreReplacement of critical leaky portion of fo jetty line near jspl/jsw railway crossing through existing culvert by hot tapping method at paradeep under odisha state office
Replacement of critical leaky portion of fo jetty line near jspl/jsw railway crossing through existing culvert by hot tapping method at paradeep under odisha state office
Read moreAmrut amrut 1 extension work laying hdpe pipe through hdd from iringaadanpally bypass
Amrut amrut 1 extension work laying hdpe pipe through hdd from iringaadanpally bypass
Read moreSupply fabrication erection and laying of pipelines including hdd and hookup with existing and operational propane or butane ippl pipeline through hot tapping method near under-construction captive jetty of iocl at kamarajar port limited ennore chenn
Supply fabrication erection and laying of pipelines including hdd and hookup with existing and operational propane or butane ippl pipeline through hot tapping method near under-construction captive jetty of iocl at kamarajar port limited ennore chenn
Read moreReplacement of the valves by creating bypass through hot tapping double stoppling method at anklav tee point in trunk pipeline of cambay asset
Replacement of the valves by creating bypass through hot tapping double stoppling method at anklav tee point in trunk pipeline of cambay asset
Read moreLaying of cs conduit by hdd and open cut method for duct and ofc and associated works at chainage 684.00 km of under barauni guwahati pipeline project of gail (india) limited
Laying of cs conduit by hdd and open cut method for duct and ofc and associated works at chainage 684.00 km of under barauni guwahati pipeline project of gail (india) limited
Read moreP/l/j 450 mm (od) hdpe pipe sewer line from rajdhani park enclave to mundka industrial area (rhs of rohtak road) through open cut /hdd method/ auger boring method. nit -07
Nit no. 07 / ee (pr) sr-i (2025-26)
Read moreSupplying and laying of 300 mm dia. m.s.10 mm thick carrier pipe with necessary flanges at both ends through 550 mm dia. casing pipe for water supply at not less than 9.00 metre below the railway track through jack pushing/hdd technique
Supplying and laying of 300 mm dia. m.s.10 mm thick carrier pipe with necessary flanges at both ends through 550 mm dia. casing pipe for water supply at not less than 9.00 metre below the railway track through jack pushing/hdd technique
Read moreSupplying and laying of 400mm dia. m.s.10 mm thick carrier pipe with necessary flanges at both ends through 600mm dia. m.s.16 mm thick casing pipe for water supply at not less than 3.00 metre below the railway track through jack pushing/hdd technique
Supplying and laying of 400mm dia. m.s.10 mm thick carrier pipe with necessary flanges at both ends through 600mm dia. m.s.16 mm thick casing pipe for water supply at not less than 3.00 metre below the railway track through jack pushing/hdd technique
Read moreSupplying and laying of 400mm dia. m.s. 10 mm thick carrier pipe with necessary flanges at both ends through 600mm dia. m.s. 16 mm thick casing pipe for water supply at not less than 3.00 metre below the railway track through jack pushing / hdd techn
Supplying and laying of 400mm dia. m.s. 10 mm thick carrier pipe with necessary flanges at both ends through 600mm dia. m.s. 16 mm thick casing pipe for water supply at not less than 3.00 metre below the railway track through jack pushing / hdd techn
Read moreof your Industry type