Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening From Single Lane To Intermediate Lane And Strengthening At Km 0/0 3/215 Of Valayapettai Mangudi Road Tnj16
|
| Description |
Widening From Single Lane To Intermediate Lane And Strengthening At Km 0/0 3/215 Of Valayapettai Mangudi Road Tnj16
|
| Organisation | Highways | State Govt. and UT |
| Tender Id | 2025_HWAY_592621_1 |
|
Reference Number |
TN NO 008 2025 - 26 TNJ16 |
| Tender Fee | 0 |
| EMD | 1.8 Lakh |
| Tender Value | |
| Place | Kumbakonam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=707756 |
| Start Date | August 22, 2025 14:30 |
| End Date |
Expired
03/09/2025
Expired 278 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Preparation of detailed project report for the work of balarampur-bagmundi road from 0.00 kmp to 26.00 kmp, widening for intermediate lane 5.50 m to 2-lane 7.0 m road and strengthening work, under purulia highway division in the district of purulia.
Read moreWork of widening and strengthening of nyay marg (kachhari road). district basti
Work of widening and strengthening of nyay marg (kachhari road). district basti
Read moreWidening and strengthening of existing perimeter road at tezu airport for the purpose of crash fire tender of 36.0 tonnes.
Widening and strengthening of existing perimeter road at tezu airport for the purpose of crash fire tender of 36.0 tonnes.
Read moreOperation and maintenance of eight lane vadodara kim expressway from km 323.00 to km 355.00 (sanpa to padra section of vadodara mumbai expressway) in the state of gujarat
Operation and maintenance of eight lane vadodara kim expressway from km 323.00 to km 355.00 (sanpa to padra section of vadodara mumbai expressway) in the state of gujarat
Read moreConstruction of atal pragati path sh-75 to nuwaliya km 0/0 to 1/250.
Construction of atal pragati path sh-75 to nuwaliya km 0/0 to 1/250.
Read moreOne time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
Read moreA/r and m/o rissa mandap baroti road km. 0/00 to 24/0
Protection work for bridge 16.75 mtrs span over giun khad at rd 20/120 both side abutments and rcc slab culvert over hiun nallah at rd 18/810 abutment of both sides and railing work
Read moreRestoration of rain damages on kufri chail road km 0/000 to 25/000
Removal of slips at various 0/000 to 25/00
Read moreRehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads
Rehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads.
Read moreWork on nh13 from km 957.56 to km 997.76 and from km 854.808 to km 871.928
Stmc work on nh13 from km 957.56 to km 997.76 and from km 854.808 to km 871.928
Read moreof your Industry type