Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Soil And Mosisture Conservation Works At Palaruvimethu In Kalamkunnu Section Of Shendurney Wildlife Sanctuary During 2023 24
|
| Description |
Smc Works At Palaruvimethu In Kalamkunnu Section
|
| Organisation | Government of Kerala |
| Tender Id | 2023_FD_632447_2 |
|
Reference Number |
SDIV 2615/2023 |
| Tender Fee | 590 |
| EMD | 2300 |
| Tender Value | - |
| Place | O/oWildlifeWarden Shendurney |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | December 29, 2023 15:30 |
| End Date |
Expired
08/01/2024
Expired 1008 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreEstimate for interlinking of 33kv uttaraspally feeder and 33kv kv chowderguda feeder for providing of alternate power suplly to thummalapally ss, veerannapet and chowderguda ss during break downs and other maintainance works in kondurg section in shadanagar sub division in shadnagar division in rajendranagar circle under summer action plan.
Estimate for interlinking of 33kv uttaraspally feeder and 33kv kv chowderguda feeder for providing of alternate power suplly to thummalapally ss, veerannapet and chowderguda ss during break downs and other maintainance works in kondurg section in shadanagar sub division in shadnagar division in rajendranagar circle under summer action plan.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreImprovement of bcrlip duplex villas in kalamkunnu section of shendurney wildlife sanctuary during 2023-24
Improvement of bcrlip duplex villas in kalamkunnu section
Read moreEstimate for the cost of maintenance of division office building of shendurney wildlife warden shendurney in kalamkunnu section in shendurney wildlife sanctuary during 2024-25
Estimate for the cost of&#x0d maintenance of division office&#x0d building of shendurney wildlife&#x0d warden shendurney in&#x0d kalamkunnu section in&#x0d shendurney wildlife sanctuary&#x0d during 2024-25&#x0d
Read moreConstruction of toilet unit at pallamvetty in kalamkunnu section of shendurney wildlife sanctuary during 2024-25
Construction of toilet unit at pallamvetty in kalamkunnu section of shendurney wildlife sanctuary during 2024-25
Read moreFire break from pallamvetty to kalamkunnu and edappalayam methu to idimuzhanganppara in kalamkunnu section of shendurney wildlife sanctuary during 2023-24
Fire break from pallamvetty to kalamkunnu and edappalayam methu to idimuzhanganppara in kalamkunnu section of shendurney wildlife sanctuary during 2023-24
Read moreDesilting of water holes at ponnammachal and idimuzhanganpara in kalamkunnu section of shendurney wildlife sanctuary during 2023-24
Desilting of water holes at ponnammachal and idimuzhanganpara in kalamkunnu section of shendurney wildlife sanctuary during 2023-24
Read moreImprovement of hall of the bcrlip building at thenmala in kalamkunnu section of shendurney wildlife sanctuary during 2023 24
Improvement of hall of the bcrlip building at thenmala in kalamkunnu section
Read moreConstruction of retaining wall near the section office building kalamkunnu at thenmala in shendurney wildlife sanctuary during 2023-24
Construction of retaining wall near the section office building kalamkunnu at thenmala
Read moreof your Industry type