Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Transportation Of Metro Rail Cars And Associated Machines Or Equipnt, Including Loading Or Unloading With Insurance Coverage, From Mandale Depot To Elevated Viaduct Of Line 4 And 4 A Between Gaimukh To Cadbury Metro Station And Vice Versa.
|
| Description |
Transportation Of Metro Rail Cars And Associated Machines Or Equipnt, Including Loading Or Unloading With Insurance Coverage, From Mandale Depot To Elevated Viaduct Of Line 4 And 4 A Between Gaimukh To Cadbury Metro Station And Vice Versa.
|
| Organisation | Mumbai Metropolitan Region Development Authority | State Govt. and UT |
| Tender Id | 2025_MMRDA_1196322_1 |
|
Reference Number |
MMMOCL-16012(12)/3/2025 |
| Tender Fee | 4040 |
| EMD | 16.56 Lakh |
| Tender Value | - |
| Place | Metro Line 4 and 4A and Mandale Depot |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2072532 |
| Start Date | July 02, 2025 16:30 |
| End Date |
Expired
07/08/2025
Expired 396 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreMaintenance contract for controlling leakage and seepage in underground/elevated section including tunnel, stations, ancillary buildings, viaduct and depot etc. of line-8 from botanical garden to krishna park extension and line-8 extension stations.
Maintenance contract for controlling leakage and seepage in underground/elevated section including tunnel, stations, ancillary buildings, viaduct and depot etc. of line-8 from botanical garden to krishna park extension and line-8 extension stations.
Read moreDesign and construction of elevated metro viaduct for nmrp phase-2 in
Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a
Read moreCivil maintenance of operational elevated and under ground stations viaduct and two depots
Civil maintenance of operational civil maintenance of operational elevated and under ground stations viaduct and two depots&#x0d of pune metro rail project of mahametro for a period of one year.
Read moreSupply, installation, testing and commissioning of viaduct lighting in elevated corridors of line-7.
Supply, installation, testing and commissioning of viaduct lighting in elevated corridors of line-7.
Read moreTrack maintenance with specialized repair services and manpower supply for phase i of metro line 2b (mandale to diamond garden) along with mandale depot, line 4 (gaimukh to cadbury jn.) and line 9 (dahisar to kashigaon)
Track maintenance with specialized repair&#x0d services and manpower supply for phase i of&#x0d metro line 2b (mandale to diamond garden)&#x0d along with mandale depot, line 4 (gaimukh to&#x0d cadbury jn.) and line 9 (dahisar to kashigaon)
Read morePart design and construction of elevated viaduct and six elevated (excluding architectural finishing ) from chainage 625.00 m to 7747.00 m of bhubaneswar metro phase-i mrts.
Part design and construction of elevated viaduct and six elevated (excluding architectural finishing ) from chainage 625.00 m to 7747.00 m of bhubaneswar metro phase-i mrts.
Read moreDesign and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreMaintenance contract for controlling leakage and seepage in elevated section/viaduct, station building, ancillary building, depot, rss and maintenance of drainage system of viaduct of line - 7 from mayur vihar phase-i (including) to shiv vihar...
Maintenance contract for controlling leakage and seepage in elevated section/viaduct, station building, ancillary building, depot, rss and maintenance of drainage system of viaduct of line - 7 from mayur vihar phase-i (including) to shiv vihar...
Read moreDesign and construction of elevated viaduct, ramp from chainage ch - 514.012 to ch- 440.000 and one elevated station including afp and pre-engineered steel roof structure and roof sheeting works of delhi mrts phase-iv project.
Design and construction of elevated viaduct, ramp from chainage ch - 514.012 to ch-440.000 and one elevated station including afp and pre-engineered steel roof structure and roof sheeting works of delhi mrts phase-iv project.
Read moreof your Industry type