Tender Details

Particulars Details
Title
Construction Of C C Road And Rcc Drain From Hingoli Road (Bora Hospital) To Dhemre House At P No 17 At Aundha (Nagnath) Dist. Hingoli
Description
Refer Tender Form
Organisation Government of Maharashtra
Tender Id 2023_DMA_946107_1
Reference
Number
Tender Notice No 14 Aundha NP 2023-24
Tender Fee 5900
EMD 22150
Tender Value
Place Chief Officer
Link https://mahatenders.gov.in
Start Date September 18, 2023 19:30
End Date

02/10/2023 ( Expired 626 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Read more
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Read more
Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal

Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal

Read more
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.

Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise