Tender Details
Particulars | Details |
---|---|
Title |
Competitive E Bidding Engagement Of Qualified Vendors With A Minimum Level 2 Certification In Vibration Analysis And Dynamic Balancing
|
Description |
Competitive E Bidding Engagement Of Qualified Vendors With A Minimum Level 2 Certification In Vibration Analysis And Dynamic Balancing
|
Organisation | UP Cooperative Sugar Factories Federation Ltd | State Govt. and UT |
Tender Id | 2024_UPSFF_971348_1 |
Reference Number |
496/UPF/TECH/388/2024-25 |
Tender Fee | 1180 |
EMD | 10000 |
Tender Value | |
Place | LUCKNOW |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1700129 |
Start Date | November 07, 2024 00:25 |
End Date |
14/11/2024 ( Expired 177 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreConstruction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new nh-152) near siwani town in the state of haryana
Construction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new nh-152) near siwani town in the state of haryana
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreRepair and maint/replacement of internal wiring, fittings and fixtures in officer/jco/ors md accn in aor of age e/m-i under ge (army) no 2 jodhpur
Repair and maint/replacement of internal wiring, fittings and fixtures in officer/jco/ors md accn in aor of age e/m-i under ge (army) no 2 jodhpur
Read moreRehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Read moreMaintenance of rehabilitation and upgradation of existing carriageway to 2 lane 4 lane with paved shoulder configuration from wadigodri to dhangripimpri km 0 000 to km 30 390 section of nh753h on epc mode in the state of maharashtra package1 risk and
Maintenance of rehabilitation and upgradation of existing carriageway to 2 lane 4 lane with paved shoulder configuration from wadigodri to dhangripimpri km 0 000 to km 30 390 section of nh753h on epc mode in the state of maharashtra package1 risk and
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreEngagement of agency for carrying out fabrication, erection and welding of tankage works, piping, structural and erection of equipments in connection with for our epcc contract-bitumen plant of m/s hpcl, visakh refinery, visakhapatnam
Engagement of agency for carrying out fabrication, erection and welding of tankage works, piping, structural and erection of equipments in connection with for our epcc contract-bitumen plant of m/s hpcl, visakh refinery, visakhapatnam
Read moreof your Industry type