Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Facility Management Services Lump Sum Based Supply Of Medicians; Supply Of Medicians; Consumable
|
Description |
|
Organisation | Health and Family Welfare Department Karnataka | |
Tender Id | GEM/2024/B/5714740 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | December 17, 2024 01:34 |
End Date |
26/12/2024 ( Expired 183 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Participated On | MSE/MII Status | Status |
---|---|---|---|---|
1 | RAMDEV PHARMA | 25-12-2024 11:52:48 | N/A | Qualified |
2 | Smart Urban | 23-12-2024 14:56:44 | N/A | Disqualified |
Supply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSupply and installation of surface area analyser (bet)
Supply, installation, commissioning and training of surface area analyser (bet)
Read moreDevelopment of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Development of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Read moreSelection of bus operator for procurement, supply, operation and maintenance of 10,900 electric buses and development of allied electric and civil infrastructure on gross cost contracting (gcc) under pm e-drive scheme
Selection of bus operator for procurement, supply, operation and maintenance of 10,900 electric buses and development of allied electric and civil infrastructure on gross cost contracting (gcc) under pm e-drive scheme.
Read moreConsultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Read moreConsultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreIe services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreof your Industry type