Upgradation Of Pooppally Kuttanad Portion Of 66 Kv Alappuzha Kuttanad Feeder To 110 Kv Dc Feeder (5 Km) Under Transmission Circle, Alappuzha Rki Project
|
Description |
Upgradation Of Pooppally Kuttanad Portion Of 66 Kv Alappuzha Kuttanad Feeder To 110 Kv Dc Feeder (5 Km) Under Transmission Circle, Alappuzha Rki Project
|
Organisation | Government of Kerala |
Tender Id | 2023_KSEB_602802_1 |
Reference Number |
KSEBL/CE(TS)/EE1/AEII /Poopally-Kuttanadu/04/2023 |
Tender Fee | 11800 |
EMD | 2 Lakh |
Tender Value | |
Place | Office of CETS, Pattom, Thiruvananthapuram |
Link | https://etenders.kerala.gov.in |
Start Date | September 14, 2023 22:30 |
End Date |
25/09/2023 ( Expired 602 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Read moreUpgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreRepair of rehabilitation and upgradation of digras darwha karanja section in (km 0.000 to 74.351) nh 361c two lanes with paved shoulder configuration in the state of maharashtra.(under risk and cost).
Repair of rehabilitation and upgradation of digras darwha karanja section in (km 0.000 to 74.351) nh 361c two lanes with paved shoulder configuration in the state of maharashtra.(under risk and cost).
Read moreConstr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Constr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreConstruction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Read moreUpgradation of road kargil-dumgil (batalik road) from cl-9 to nhdl specifications from existing km 35.160 to km 49.754 (design chainage km 0.000 to km 14.594) under project vijayak, in ladakh (ut) on epc mode