| Particulars | Details |
|---|---|
| Title |
Lie/Lir For Tangedco/Udangudi 2 X 660 Mw Stpp,Ntpl / Tuticorin Fgd Package 2 X 500 Mw Tpp,Ntpc North Karanpura 3x660 Mw Fgd And Wbpdcl Bakreshwar (210 Mw) Tpp Unit#4
|
| Description |
Lie/Lir For Tangedco/Udangudi 2 X 660 Mw Stpp,Ntpl / Tuticorin Fgd Package 2 X 500 Mw Tpp,Ntpc North Karanpura 3x660 Mw Fgd And Wbpdcl Bakreshwar (210 Mw) Tpp Unit#4
|
| Organisation | Bharat Heavy Electricals Limited (BHEL) |
| Tender Id | 2023_BHEL_28756_1 |
|
Reference Number |
NJP0000005 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | BHEL EDN, BANGALORE |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in |
| Start Date | September 19, 2023 21:00 |
| End Date |
Expired
10/10/2023
Expired 983 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of lie/lir to ntpl / tuticorin fgd package 2 x 500mw tpp
Supply of lie/lir to ntpl / tuticorin fgd package 2 x 500mw tpp
Read moreSupply and installation of hvac system for fgd project for 3x660 mw ntpc north karanpura stpp
Supply and installation of hvac system for fgd project for 3x660 mw ntpc north karanpura stpp
Read moreProcurement of ipt crossover pipe gasket for unit 1 and 2 of north karanpura stpp 3 x 660 mw.
Procurement of ipt crossover pipe gasket for unit 1 and 2 of north karanpura stpp 3 x 660 mw.
Read moreBalance work of civil package for chimney unit 2 at 3x660 mw north karanpura stpp for bhel ntpc, north ka district- chatra (jharkhand) at risk and cost of previous agency
Balance work of civil package 
 for chimney unit 2 at 3x660 mw
 north karanpura stpp for bhel ntpc, north
 ka district- chatra (jharkhand) at risk and
 cost of previous agency
Read moreDetdetailed design engineering supply installation, testing and commissioning of permanent electrical items for 2 nos of 150 meter high reinforced concrete single steel flue chimney unit 1 2 of fgd system at 3 660 mw north karanpura stpp jharkhand
Detdetailed design engineering supply installation, testing and commissioning of permanent electrical items for 2 nos of 150 meter high reinforced concrete single steel flue chimney unit 1 2 of fgd system at 3 660 mw north karanpura stpp jharkhand
Read moreDeployment of 4 nos graduate engineers (1 nos in mechanical 1 nos incivil 1 nos in electrical and 1 nos in cni) for fgd package of 4 x 500mw simhadri ntpc for a period of 12 months
Deployment of 4 nos graduate engineers (1 nos in mechanical 1 nos incivil 1 nos in electrical and 1 nos in cni) for fgd package of 4 x 500mw simhadri ntpc for a period of 12 months
Read moreVfd retrofit for existing bhel feed rc feeders 20 nos as per sow at unit 3 and unit 4 ntpc simhadri tpp, stage 2 2x500mw
Vfd retrofit for existing bhel feed rc feeders 20 nos as per sow at unit 3 and unit 4 ntpc simhadri tpp, stage 2 2x500mw
Read moreEngaging separate agency for part duct work from buf to absorber inlet for unit-4 stage-ii at 3x200mw 3x500mw ntpc ramagundam stage- i and ii, fgd package
Engaging separate agency for part duct work from buf to absorber inlet for unit-4 stage-ii at 3x200mw 3x500mw ntpc ramagundam stage- i and ii, fgd package
Read moreof your Industry type