Tender Details

About Tender

🏭 Up Power Transmission Corp.Ltd. (Operation) πŸ”§πŸš§ Invitation For Bids: Rewinding Of 10 H.P 3 Phase Motor And Water Pipeline Construction πŸ“ Location: Electrical Sub Station (Ess), Banda πŸ“… Last Date For Bid Submission: April 29, 2024, 10:00 Am πŸ’΅ Tender Fee: Inr 590 πŸ’° Earnest Money Deposit (Emd): Inr 40,000 The Project Involves The Rewinding Of A 10 H.P 3 Phase Motor And The Laying Of A Water Pipeline From A Water Source Near The Admin Building To The Existing Pipeline At The 400 Kv S/S Banda. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, Adhering To The Tender Guidelines. Keywords: Up Power Transmission Corp.Ltd., Operation, Rewinding, 10 H.P 3 Phase Motor, Water Pipeline Construction, Bidding, State Govt. And Ut, Electrical Sub Station, Banda, Tender, Emd
Particulars Details
Title
Work
Description
Work Details For Rewinding Of 10 H.P 3 Phase Motor Laying Of Water Pipe Line From Water Source Near Admin Building To Existing Pipe Line At 400 Kv S/S Banda
Organisation UP Power Transmission Corp.Ltd (Operation) | State Govt. and UT
Tender Id 2024_UPTCL_922481_1
Reference
Number
T-01/E.400KVS/SDIV.(B)/2024-25
Tender Fee 590
EMD 4000
Tender Value
Place electy 400 Kv S S Div Banda
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1593475
Start Date April 18, 2024 19:00
End Date

29/04/2024 ( Expired 396 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Completion of incomplete work of provn of 01 mw solar power plant work at vadodara

Completion of incomplete work of provn of 01 mw solar power plant work at vadodara

Read more
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work

Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work

Read more
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor

Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.

Read more
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Read more
Term contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon

Term contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon

Read more
Term contract for artificer work in technical area of age b/r - i under ge (af) lohegaon

Term contract for artificer work in technical area of age b/r - i under ge (af) lohegaon

Read more
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Read more
Round the clock routine maintenance alongwith prive, breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/

Round the clock routine maintenance alongwith prive , breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise