Tender Details
About Tender
π Up Power Transmission Corp.Ltd. (Operation) π§π§ Invitation For Bids: Rewinding Of 10 H.P 3 Phase Motor And Water Pipeline Construction π Location: Electrical Sub Station (Ess), Banda π Last Date For Bid Submission: April 29, 2024, 10:00 Am π΅ Tender Fee: Inr 590 π° Earnest Money Deposit (Emd): Inr 40,000 The Project Involves The Rewinding Of A 10 H.P 3 Phase Motor And The Laying Of A Water Pipeline From A Water Source Near The Admin Building To The Existing Pipeline At The 400 Kv S/S Banda. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, Adhering To The Tender Guidelines. Keywords: Up Power Transmission Corp.Ltd., Operation, Rewinding, 10 H.P 3 Phase Motor, Water Pipeline Construction, Bidding, State Govt. And Ut, Electrical Sub Station, Banda, Tender, EmdParticulars | Details |
---|---|
Title |
Work
|
Description |
Work Details For Rewinding Of 10 H.P 3 Phase Motor Laying Of Water Pipe Line From Water Source Near Admin Building To Existing Pipe Line At 400 Kv S/S Banda
|
Organisation | UP Power Transmission Corp.Ltd (Operation) | State Govt. and UT |
Tender Id | 2024_UPTCL_922481_1 |
Reference Number |
T-01/E.400KVS/SDIV.(B)/2024-25 |
Tender Fee | 590 |
EMD | 4000 |
Tender Value | |
Place | electy 400 Kv S S Div Banda |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1593475 |
Start Date | April 18, 2024 19:00 |
End Date |
29/04/2024 ( Expired 396 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Completion of incomplete work of provn of 01 mw solar power plant work at vadodara
Completion of incomplete work of provn of 01 mw solar power plant work at vadodara
Read moreProcurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreTerm contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Term contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Read moreTerm contract for artificer work in technical area of age b/r - i under ge (af) lohegaon
Term contract for artificer work in technical area of age b/r - i under ge (af) lohegaon
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreRound the clock routine maintenance alongwith prive, breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Round the clock routine maintenance alongwith prive , breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreof your Industry type