Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Alamnagar Rosa (Dn) Trr(p) 24.30 Tkm In The Section Of Aden/I/Hri,Trr(s)=1.407 Km In Blm Rac And Tfr=(16.976 Tkm In Blm Spc Section And 46 Tkm In On Blm) In The Section Of Aden/Ii/Hri .
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76662938 |
Reference Number |
102-DRM-MB-24-25 |
Tender Fee | 0 |
EMD | 2.42 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/092024/76662938/viewNitPdf_4669481.pdf |
Start Date | August 07, 2024 22:21 |
End Date |
02/09/2024 ( Expired 301 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreIndependent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreStrengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreI) construction of service road from ch.60.200 to 60.960 (rhs) (including minor bridge at ch. 60.805 (rhs)) ii) fob at ch.55.150 and iii) repair of service road from ch.39.300 to ch.41.050 on kurali-kiratpur section from km 28.600 to km. 73.200
I) construction of service road from ch.60.200 to 60.960 (rhs) (including minor bridge at ch. 60.805 (rhs)) ii) fob at ch.55.150 and iii) repair of service road from ch.39.300 to ch.41.050 on kurali-kiratpur section from km 28.600 to km. 73.200
Read moreNctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii
Nctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii
Read moreNctps i es circle em i dn s dn i annual maintenance works in generator transformers unit auxiliary transformers and station transformers of unit i ii iii during the annual capital overhauling period for the year 2025 26 at nctps i
Nctps i es circle em i dn s dn i annual maintenance works in generator transformers unit auxiliary transformers and station transformers of unit i ii iii during the annual capital overhauling period for the year 2025 26 at nctps i
Read moreof your Industry type