Tender Details

Particulars Details
Title
Construction Of Four Lane Of Chausa Buxar Bypass From Km 45.000 To Km 65.915 (Package 2) Of Nh 319 A In The State Of Bihar On Epc Mode
Description
Construction Of Fourlane Of Chausa Buxar Bypass From Km 45.000 To Km 65.915 (Package 2) Of Nh 319 A In The State Of Bihar On Epc Mode
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2023_MoRTH_771659_1
Reference
Number
Tender Fee 60000
EMD 6.32 Crore
Tender Value
Place New Delhi
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=811164

Start Date October 23, 2023 16:30
End Date
Expired 22/02/2024

Expired 856 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode

Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Reconstruction and repair of major bridge on dhadhar river at km. 180/000 to 180/400 on nh-64 in bharuch district in the state of gujarat on epc mode

Reconstruction and repair of major bridge on dhadhar river at km.&#x0d 180/000 to 180/400 on nh-64 in bharuch district in the state of&#x0d gujarat on epc mode

Read more
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp

Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp

Read more
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Read more
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement

Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement

Read more
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp

Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp

Read more
Click Here to Download Dockets
of your Industry type