Tender Details

Particulars Details
Title
Extended Tembhu Scheme Construction Of Gravity Main And Pipe Line Distribution Network For Kamath Gravity Main Offtaking From Kamath Storage Tank Including Repair Operation And Maintenance Of System For Five Years Tal Atpadi Dist Sangli
Description
Extended Tembhu&Amp#X0d Scheme Construction Of Gravity Main And Pipe Line&Amp#X0d Distribution Network For Kamath Gravity Main Offtaking&Amp#X0d From Kamath Storage Tank Including Repair Operation&Amp#X0d And Maintenance Of System For Five Years Tal Atpadi&Amp#X0d Dist Sangli
Organisation CE-Water Resources Dept. Pune | State Govt. and UT
Tender Id 2023_WRDMN_966357_2
Reference
Number
E Tender Notice No.5 For 2023-24
Tender Fee 11800
EMD 1.31 Crore
Tender Value
Place Atpadi
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1787146
Start Date March 01, 2024 18:30
End Date

01/04/2024 ( Expired 452 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repair maint of external water supply distribution network and clearing painting of oh waer storage tank supply of chemical for water treatment and other connected work at 24ed af stn manauri

Repair maint of external water supply distribution network and clearing painting of oh waer storage tank supply of chemical for water treatment and other connected work at 24ed af stn manauri

Read more
Operation and maintenance of lwss seer khad to bhiyanu peer group of villages in tehsil ghumarwin district bilaspur (sh operation and maintenance of pumping machinery and distributions system of water supply for main storage tank to different sub sto

Operation and maintenance of lwss seer khad to bhiyanu peer group of villages in tehsil ghumarwin district bilaspur (sh operation and maintenance of pumping machinery and distributions system of water supply for main storage tank to different sub sto

Read more
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines for atpukur water supply scheme, z-ii, minakhan block under hasnabad sub-divn. p.h.e. dte. (period - for 6 months).

Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines for atpukur water supply scheme, z-ii, minakhan block under hasnabad sub-divn. p.h.e. dte. (period - for 6 months).

Read more
Construction of additional 100000 ltrs capacity over head tank and laying of pipe line connecting with existing rising main, oht and distribution pipe for rpws to village risigaon under khariar block in the district of nuapada

Construction of additional 100000 ltrs capacity over head tank and laying of pipe line connecting with existing rising main, oht and distribution pipe for rpws to village risigaon under khariar block in the district of nuapada

Read more
A/r and m/o lwss talwara chharal in tehsil ghumarwin district bilapsur (sh operation of pumping machinery and distribution system of water supply for sector storage tank to different habitation for one year).

A/r and m/o lwss talwara chharal in tehsil ghumarwin district bilapsur (sh operation of pumping machinery and distribution system of water supply for sector storage tank to different habitation for one year).

Read more
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines ci/di/upvc/hdpe/gi, valves, valves chambers, stand posts including repairing of fhtc connection and providing new fhtc connection for talsa water s

Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines ci/di/upvc/hdpe/gi, valves, valves chambers, stand posts including repairing of fhtc connection and providing new fhtc connection for talsa water s

Read more
Repair/ maintenance of water supply distribution system including pipe line network, valve pit repair and allied works at ahrr under ge e/m rr hospital delhi cantt-10.

Repair/ maintenance of water supply distribution system including pipe line network, valve pit repair and allied works at ahrr under ge e/m rr hospital delhi cantt-10.

Read more
Construction of distribution system for 3499.70 ha. of cca including command area development (cad) of salandi left main canal from rd 30.547 km to 40.927 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project

Construction of distribution system for 3499.70 ha. of cca including command area development (cad) of salandi left main canal from rd 30.547 km to 40.927 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project

Read more
Operation and maintenance of alirajpur lift irrigation scheme for 03 years including its pressurized pipe distribution network for irrigation in 35000 hectares cca on turnkey contract as per detailed scope of work (but not limited of that).

Operation and maintenance of alirajpur lift irrigation scheme for 03 years including its pressurized pipe distribution network for irrigation in 35000 hectares cca on turnkey contract as per detailed scope of work (but not limited of that).

Read more
Providing consultancy services for design of switchyard (electrical and civil) and electric line route maps for pressurized pipe distribution network under jigaon project tq nandura dist buldhana

Providing consultancy services for design of switchyard (electrical and civil) and electric line route maps for pressurized pipe distribution network under jigaon project tq nandura dist buldhana

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise