Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Arm Of Civil Work In Non Residential Buildings For The Year 2025 26 Sh Finishing Work Painting Work And Distempering Etc
|
Description |
Arm Of Civil Work In Non Residential Buildings For The Year 2025 26 Sh Finishing Work Painting Work And Distempering Etc
|
Organisation | DG, Indo-Tibetan Border Police Force | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 11987 |
Tender Value | |
Place | SPT BN ITBP KARERA |
Link |
AAAAAAAAAA Login to view |
Start Date | June 05, 2025 22:30 |
End Date |
28/06/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewNotice inviting expression of interest eoi for registration of radiologist and firms for empanelment in tele radiology reporting panel
Read moreAAAAAAAAAA
Login to viewPollution abatement integrated septage treatment plant (22 kld fstp) for uttarpara-kotrung municipality, hooghly district west bengal on a design- build- operation-transfer (dbot) model with 05 (five) year operation and maintenance period....
Read moreConsultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Read more26 of 2025-26 of se/wbswc
Request for proposal for selection of system integrator to implement a comprehensive warehouse monitoring solution based on computer vision and ai for monitoring, analyzing, and optimizing warehouse operations, including inventory and security
Read moreAllotment of land on long term lease annual lease rental basis of 30 years, on as is where is basis in zone - z 8, plot 8956.75 sq.m. west side of land leased to andaman and nicobar, near deep bhavan in salagramapuram for the purpose under non-port r
Allotment of land on long term lease annual lease rental basis of 30 years, on as is where is basis in zone - z 8, plot 8956.75 sq.m. west side of land leased to andaman and nicobar, near deep bhavan in salagramapuram for the purpose under non-port r
Read moreSelection of concessionaire for ther work of development of municipal solid waste processing facility in design built finance and operate on royalty basis and transfer (on ppp model) which include waste to bio-gas plant and mrf facility at kedarpur
Selection of concessionaire for ther work of development of municipal solid waste processing facility in design built finance and operate on royalty basis and transfer (on ppp model) which include waste to bio-gas plant and mrf facility at kedarpur
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreDemolition of existing rcc buildings such as painting hangar toilet block removal of existing old roof sheets acs and other structure bulows providing area for parking metro cars with covered roofing at eastern side of tatra hangar for parking area
Demolition of existing rcc buildings such as painting hangar toilet block removal of existing old roof sheets acs and other structure bulows providing area for parking metro cars
 with covered roofing at eastern side of tatra hangar for parking area
Read moreGeotechnical sub soil investigation and topographical survey by total station machine in the district of paschim medinipur and jhargram during the year 2025-2026 (2nd call).
Geotechnical sub soil investigation and topographical survey by total station machine in the district of paschim medinipur and jhargram during the year 2025-2026.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreof your Industry type