Tender Details
Particulars | Details |
---|---|
Title |
Repair/Replacement Of Charpoy Double Bunk, Charpoy Gi Pipe And Charpoy Steel With Ply Top And Other Connected Works At Ins Chilka
|
Description |
Repair/Replacement Of Charpoy Double Bunk, Charpoy Gi Pipe And Charpoy Steel With Ply Top And Other Connected Works At Ins Chilka
|
Organisation | E-IN-C BRANCH - MILITARY ENGINEER SERVICES | Central Govt. Ministry/Department |
Tender Id | 2025_MES_692729_1 |
Reference Number |
GE/CHL/8104 OF 2024-25 |
Tender Fee | 500 |
EMD | 36000 |
Tender Value | |
Place | GE Chilka |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=775520 |
Start Date | January 19, 2025 14:30 |
End Date |
30/01/2025 ( Expired 81 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreDesign and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Design and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Read moreRehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Read moreReplacement of filter media in slow sand filter bed with replacement of door of guard room
Replacement of filter media in the slow sand filter bed with replacement of door and of guard room, repairing of storage godown and fittings and face lifting etc. at lallmitti water treatment plant under beodnabad section.
Read moreSuplly and installation of public address system with table top/ podium microphone (online support) and accessories at rims, ranchi.
Suplly and installation of public address system with table top/ podium microphone (online support) and accessories at rims, ranchi.
Read moreSupply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Supply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Read moreWbpwd/pw(r)/se/shc/nit no 03 of 2025-2026(4th-call)
Sukanta setu(r.o.b) with approaches - replacement of damaged surface course and other allied works of repair and maintenance in footpath ,railing etc under alipore highway sub division under south 24 parganas highway division in the district of sout
Read moreRepair/replacement of internal wiring and allied works at jcos/or md accn and otm accn in upper garrison at yol cantt under age e/m of ge (kh) yol
Repair/replacement of internal wiring and allied works at jcos/or md accn and otm accn in upper garrison at yol cantt under age e/m of ge (kh) yol
Read moreComprehensive repair to roof, false ceiling, joinery, plastering, connecting pavement, plumbing, aluminium partition and connected works in 27 camp and 28 camp at yol cantt under age br-i of ge (kh) yol
Comprehensive repair to roof, false ceiling, joinery, plastering, connecting pavement, plumbing, aluminium partition and connected works in 27 camp and 28 camp at yol cantt under age br-i of ge (kh) yol
Read moreP, l, j, testing and comm. of pipe line for rising main, cons. and comm. of reservoirs and pumping system, source and ancillary works with o and m of the system for 5 years for 21 villages of kgbas block and 01 urban town kishangarhbas
P, l, j, testing and comm. of pipe line for rising main, cons. and comm. of reservoirs and pumping system, source and ancillary works with o and m of the system for 5 years for 21 villages of kgbas block and 01 urban town kishangarhbas
Read moreof your Industry type