Tender Details
Particulars | Details |
---|---|
Title |
Transportation Of High Head Pump (1000 Gpm), Motor, Starter And New Pipes From Surface To Underground And Laying Of Pipeline From Surface To 38 Le/7 D Of 40 Le Sump And Installation Of Pump, Motor And Starter Including Foundation Work At 37 Le/7 D
|
Description |
Transportation Of High Head Pump (1000 Gpm), Motor, Starter And New Pipes From Surface To Underground And Laying Of Pipeline From Surface To 38 Le/7 D Of 40 Le Sump And Installation Of Pump, Motor And Starter Including Foundation Work At 37 Le/7 D At Dhl
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_SECL_283509_1 |
Reference Number |
SECL/KB/GM/SO(M)/eNIT/23-24/14 |
Tender Fee | |
EMD | 5500 |
Tender Value | |
Place | Office of the General Manager Korba Area Post and |
Link | https://coalindiatenders.nic.in |
Start Date | July 13, 2023 16:30 |
End Date |
28/07/2023 ( Expired 674 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of m and r of motor starter and pumps as well as round o clock operation of tube wells at new colony and tower for two years in harduaganj thermal power station uprvunl, kasimpur, aligarh, uttar pradesh
Work of m and r of motor starter and pumps as well as round o clock operation of tube wells at new colony and tower for two years in harduaganj thermal power station uprvunl, kasimpur, aligarh, uttar pradesh
Read moreSitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read moreProcurement of di pipe for the work construction of ugr laying of clear water rising main installation of pump and other allied work in connection with the work augmentation of water supply to tusura town.
Procurement of di pipe for the work construction of ugr laying of clear water rising main installation of pump and other allied work in connection with the work augmentation of water supply to tusura town.
Read moreSupply and installation of electrical wire from master control panel to various control panels of super structure and control panel of each gate at okhla barrage new delhi
Supply and installation of electrical wire from master control panel to various control panels of super structure and control panel of each gate at okhla barrage new delhi&#x0d
Read moreDrilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div
Read moreInstallation of submersible motor pump including electrification work installation complete with labor and material at site ward no. 47 file no. 189/25x9/1
Installation of submersible motor pump including electrification work installation complete with labor and material at site ward no. 47 file no. 189/25x9/1
Read moreDrilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis
Read moreDrilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation and handpump installation with material complete at different location under wub division rural at ward 61
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation and handpump installation with material complete at different location under wub division rural at ward 61
Read moreConstruction of sump tank installation of motor and its connected pipeline, chainlink fencing along the boundary of substation including gate, internal and external painting, replacement of damaged tiles for the control house building and other miscellaneous works at 132/33kv ss amalapuram
Construction of sump tank installation of motor and its connected pipeline, chainlink fencing along the boundary of substation including gate, internal and external painting, replacement of damaged tiles for the control house building and other miscellaneous works at 132/33kv ss amalapuram
Read moreDoor to door collection of waste from house hold and other places etc sweeping of roads and same transportation of waste to processing site maintanance of public toilets cleaning of drains transportation etc at mc desaiganj 2025-2026
Door to door collection of waste from house hold and other places etc sweeping of roads and same transportation of waste to processing site maintanance of public toilets cleaning of drains transportation etc work at mc desaiganj 2025-2026
Read moreof your Industry type