Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rcc G1 Ps Building At Kachudaram Ps Of Cachar District Assam Under Moitri Scheme On Engineering Procurement And Construction Epc Mode 1 Basis.
|
| Description |
Construction Of Rcc G1 Ps Building At Kachudaram Ps Of Cachar District Assam Under Moitri Scheme On Engineering Procurement And Construction Epc Mode 1 Basis.
|
| Organisation | Assam Police Housing Corporation Ltd | State Govt. and UT |
| Tender Id | 2025_APHC_42824_1 |
|
Reference Number |
APHC/CS/152/2024-25_ Kachudaram PS |
| Tender Fee | 6234 |
| EMD | 6.23 Lakh |
| Tender Value | |
| Place | Kachudaram PS, Cachar |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=68609 |
| Start Date | February 27, 2025 19:30 |
| End Date |
Expired
21/03/2025
Expired 456 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design engineering and procurement for construction of residential and non residential buildings of 3rd battalion of up special security force at district prayagraj uttar pradesh india on epc mode
Design engineering and procurement for construction of residential and non residential buildings of 3rd battalion of up special security force at district prayagraj uttar pradesh india on epc mode
Read moreConstruction of foot bridge from malik mohalla to parallel bypass, mc kupwara on epc (engineering, procurement and construction)
Construction of foot bridge from malik mohalla to parallel bypass, mc kupwara on epc (engineering, procurement and construction)
Read moreConstruction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreReconstruction and repair of major bridge on dhadhar river at km. 180/000 to 180/400 on nh-64 in bharuch district in the state of gujarat on epc mode
Reconstruction and repair of major bridge on dhadhar river at km.
 180/000 to 180/400 on nh-64 in bharuch district in the state of
 gujarat on epc mode
Read moreConstruction of rcc g plus 1 civil defence store cum office building at jorhat
Construction of rcc g plus 1 civil defence store cum office building at jorhat
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstruction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Construction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Read moreConstruction of vishramgreh area at nro at raipur - vizag expy 74 km rhs on raipur - visakhapatnam expressway, site 1 - 74 km on rhs from origin abhan
Construction of vishramgreh area at nro at raipur - vizag expy 74 km rhs on raipur - visakhapatnam expressway, site 1 - 74 km on rhs from origin abhanpur (wsa site), district-dhamtari, raipur territory.
Read moreConstruction of vishramgreh area at nro at raipur - vizag expy 74 km lhs on raipur - visakhapatnam expressway, site 1 - 74 km on lhs from origin abha
Construction of vishramgreh area at nro at raipur - vizag expy 74 km lhs on raipur - visakhapatnam expressway, site 1 - 74 km on lhs from origin abhanpur (wsa site), district-dhamtari, raipur territory
Read moreof your Industry type