Tender Details

Particulars Details
Title
Cutting And Clearing Jungle Growth And Trees From Location No 65 To 101 Of Sbem I Under Lms Moozhiyar
Description
Cutting And Clearing Jungle Growth And Trees From Location No 65 To 101 Of Sbem I Under Lms Moozhiyar
Organisation Kerala State Electricity Board | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1888
EMD 19300
Tender Value
Place Sabarigiri HEP to Edamon substation
Link

AAAAAAAAAA

Login to view
Start Date June 10, 2025 16:30
End Date

26/06/2025 ( 13 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Read more
Supply of veg fresh, fruit fresh and ice (mm) at 387 (i) sup pl asc beas

Supply of veg fresh, fruit fresh and ice (mm) at 387 (i) sup pl asc beas for the period from 01 oct 2025 to 30 sep 2026

Read more
Supply of veg fresh, fruit fresh and ice (mm) at 106 (i) comp pl asc kapurthala

Supply of veg fresh, fruit fresh and ice (mm) at 106 (i) comp pl asc kapurthala for the period from 01 oct 2025 to 30 sep 2026

Read more
Laying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6

Laying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6

Read more
Maintenance and repair to summer and cooling appliances at no 2afsb mysore under age i af chimney hills

Maintenance and repair to summer and cooling appliances at no 2afsb mysore under age i af chimney hills

Read more
Construction of cement concrete road from subhadra store to ashram at tehatta under tehatta g.p. under tehatta-i development block

Construction of cement concrete road from subhadra store to ashram at tehatta under tehatta g.p. under tehatta-i development block

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise