Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Procurement Of Steel Material For Life Enhancement And Structural Strengthening Job Of Conveyor 2 A1 And 2 B1 Under Chp Mm Dept., Ktps Through Capex 25 26
|
Description |
Procurement Of Steel Material For Life Enhancement And Structural Strengthening Job Of Conveyor 2 A1 And 2 B1 Under Chp Mm Dept., Ktps Through Capex 25 26
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 67000 |
Tender Value | |
Place | Kolaghat Thermal Power Station |
Link |
AAAAAAAAAA Login to view |
Start Date | June 26, 2025 17:30 |
End Date |
11/07/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Read moreSupply, installation and commissioning of 145kv disconnector for bus section bay at 132kv main bus at btps switchyard under capex 2025-26.
Supply, installation and commissioning of 145kv disconnector for bus section bay at 132kv main bus at btps switchyard under capex 2025-26.
Read moreSs of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04
Ss of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04
Read moreBiennial rate contract for pest control at all mcc room, cable vault, ht-lt switchgear room, plc room under emiph, emoph, ahp-em and chp-em of ktps
Biennial rate contract for pest control at all mcc room, cable vault, ht-lt switchgear room, plc room under emiph, emoph, ahp-em and chp-em of ktps
Read moreSupply and delivery of pipe and fittings spares for dust suppression system at conv101b side under chp-mm dept. at bktps.
Supply and delivery of pipe and fittings spares for dust suppression system at conv101b side under chp-mm dept. at bktps.
Read moreService job for line laying, rotation, pump erection and other associated jobs for installing ash water recovery system under ahpmm through capex 2025-26.
Service job for line laying, rotation, pump erection and other associated jobs for installing ash water recovery system under ahpmm through capex 2025-26.
Read moreWidening strengthening and reconstruction of pakur-barharwa main road (12th km of nh133a) to pali gagan pahadi west bengal border via kushma fatak road (length-6.630 km.) under road division pakur for the year- 2025-26
Widening strengthening and reconstruction of pakur-barharwa main road (12th km of nh133a) to pali gagan pahadi west bengal border via kushma fatak road (length-6.630 km.) under road division pakur for the year- 2025-26
Read moreProcurement of spares for bottom ash system system of unit#3 for the upcoming oh in 2026 under ahp (mm) dept., ktps
Procurement of spares for bottom ash system system of unit#3 for the upcoming oh in 2026 under ahp (mm) dept., ktps
Read moreProviding drinking water facility through canal surface source for 7 villages of lunkarnsar mla constituency district bikaner with 5 year oandm and 1 year dlp under cmba 2025-26
Providing drinking water facility through canal surface source for 7 villages of lunkarnsar mla constituency district bikaner with 5 year oandm and 1 year dlp under cmba 2025-26
Read moreLife enhancement of the beams under the rail line at track hopper -1 and 2 at chp, bktps (phase 1), capex 24-25.
Life enhancement of the beams under the rail line at track hopper -1 and 2 at chp, bktps (phase 1), capex 24-25.&#x0d &#x0d
Read moreof your Industry type