Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Service Contract For Life Enhancement Job Of Structure Of Conveyor Belts At Tunnel Area (Conveyor 2 A/B/C/D And 7 A/B/C/D), Through Capex 2023 24 For Chp/Ktps
|
| Description |
Service Contract For Life Enhancement Job Of Structure Of Conveyor Belts At Tunnel Area (Conveyor 2 A/B/C/D And 7 A/B/C/D), Through Capex 2023 24 For Chp/Ktps
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_WBPDC_556741_1 |
|
Reference Number |
GM(K)/CC/CHP-MM/ 3575/E2655/23-24 |
| Tender Fee | 0 |
| EMD | 1.09 Lakh |
| Tender Value | - |
| Place | Tender Opening Hall,GM bldg, KTPS |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | August 24, 2023 21:30 |
| End Date |
Expired
09/09/2023
Expired 1132 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Custom bid for services - fabrication of rollers for conveyor belts at chp umrer ocm
Custom bid for services - fabrication of rollers for conveyor belts at chp umrer ocm
Read moreProcurement of conveyor belts (1400 and 1600 mm width) for unit-5 (660 mw) chp, sgtpp
Procurement of conveyor belts (1400 and 1600 mm width) for unit-5 (660 mw) chp, sgtpp
Read moreFabrication and installation of temporary 4l trestle to support a part of existing 1a-1b conveyor structure at dvc, ktps.
Fabrication and installation of temporary 4l trestle to support a part of existing 1a-1b conveyor structure at dvc, ktps.
Read moreBiennial rate contract for coal cleaning and housekeeping at all routes of post crusher zone under conveyor belt 6a/b/c and s/r-1/2/3 at chp, ktps under chp(o).
Biennial rate contract for coal cleaning and housekeeping at all routes of post crusher zone under conveyor belt 6a/b/c and s/r-1/2/3 at chp, ktps under chp(o).
Read moreSupply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Read moreCollection, preparation, transportation and analysis of feeder coal, mill reject coal, bottom ash and fly ash, pc sample, coal samples from conveyor belts of chp-1 and chp-2, stockyard, collection and preparation of kecm rakes from wagon top at wts and any other special coal samples at rtps
Collection, preparation, transportation and analysis of feeder coal, mill reject coal, bottom ash and fly ash, pc sample, coal samples from conveyor belts of chp-1 and chp-2, stockyard, collection and preparation of kecm rakes from wagon top at wts and any other special coal samples at rtps
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreSupply and delivery of rollers and brackets for life enhancement of structure of conveyor belts at tunnel area for chp ktps under capex 2023 2024
Supply and delivery of rollers and brackets for life enhancement of structure of conveyor belts at tunnel area for chp ktps under capex 2023 2024
Read moreLife enhancement , structural strengthening job of conveyor-2a/1 , 2b/1 at chp,ktps through capex 25-26.
Life enhancement and structural strengthening job of conveyor-2a/1 and 2b/1 at chp,ktps through capex 25-26.
Read moreSupply of steel materials for structure of conveyor belts at tunnel area of chp at ktps through capex, 23-24.
Supply of steel materials for structure of conveyor belts at tunnel area of chp at ktps through capex, 23-24.
Read moreof your Industry type