Tender Details

Particulars Details
Title
Engagement Of User Fee Collection Agency On The Basis Of Cb Through E Tender On Thandikhui Fp At Km 88.300 For Pathankot Jammu Section Of Nh 1 A From Km 16.350 To Km 97.200/0.00 And From Km 0.00 To Km 15.00 In J And K
Description
Engagement Of User Fee Collection Agency On The Basis Of Cb Through E Tender On Thandikhui Fp At Km 88.300 For Pathankot Jammu Section Of Nh 1 A From Km 16.350 To Km 97.200/0.00 And From Km 0.00 To Km 15.00 In J And K
Organisation Central Public Procurement Portal 2
Tender Id 2024_NHAI_180028_1
Reference
Number
NHAI/13013/547/CO/ 23-24/CB/Thandikhui FP
Tender Fee 0
EMD 0
Tender Value
Place NHAI HQ
Link https://etenders.gov.in
Start Date January 02, 2024 17:30
End Date

15/01/2024 ( Expired 494 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call

6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call

Read more
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Read more
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Read more
Rehabilitation and upgradation of jamkhed to sautada section of nh 548d from design ch km 195.375 to ch km 208.774 to two lane with paved shoulder four lane configuration with rigid pavement in the state of maharashtra on epc mode under risk and cost

Rehabilitation and upgradation of jamkhed to sautada section of nh 548d from design ch km 195.375 to ch km 208.774 to two lane with paved shoulder four lane configuration with rigid pavement in the state of maharashtra on epc mode under risk and cost

Read more
Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis

Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis

Read more
4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).

4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise