Tender Details
Particulars | Details |
---|---|
Title |
Making Of 6 Nos. Earth Pits And Connection Of Earth Wiring For Different Overhead Lines And For 2 Nos. Transformers Installed At New Dangal Dhawra Substation Our Tilaboni Colliery
|
Description |
Making Of 6 Nos. Earth Pits And Connection Of Earth Wiring For Different Overhead Lines And For 2 Nos. Transformers Installed At New Dangal Dhawra Substation Our Tilaboni Colliery
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_301762_1 |
Reference Number |
ECL/GM/BA/E TENDER/23-24/EnM/318 Dt. 16.02.2024 |
Tender Fee | 0 |
EMD | 2500 |
Tender Value | |
Place | Tilaboni Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=312590 |
Start Date | February 17, 2024 23:30 |
End Date |
27/02/2024 ( Expired 421 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply and fixing of lightening arrestor of different types and supply and fixing of pvc antistatic insulating mate and making, testing and commissioning of maintenance free earth pits at various locations within mine premises required for monsoon
Supply and fixing of lightening arrestor of different types and supply and fixing of pvc antistatic insulating mate and making, testing and commissioning of maintenance free earth pits at various locations within mine premises required for monsoon
Read moreReplacement of 2 nos. 220kv old, obsolete and manual operated and 17 no. old, obsolete and manual operated 66 kv isolators with new motorized 220kv and 66 kv isolators installed at 220 kv s/stn bbmb ballabhgarh
Replacement of 2 nos. 220kv old, obsolete and manual operated and 17 no. old, obsolete and manual operated 66 kv isolators with new motorized 220kv and 66 kv isolators installed at 220 kv s/stn bbmb ballabhgarh
Read moreErection of 300mtrs of 50mm dia and 47mtr of 25mm dia u-pvc pipeline for daily watering of 47 nos. of earth-pits installed at colony sub-station,10no. substation and enm workshop of sarubera project under kuju area.
Erection of 300mtrs of 50mm dia and 47mtr of 25mm dia u-pvc pipeline for daily watering of 47 nos. of earth-pits installed at colony sub-station,10no. substation and enm workshop of sarubera project under kuju area.
Read moreThe work for attending oil leakage from various points of 2 nos. 10 mva power t/f installed at 33/11 kv s/s townhall, varanasi under ee, uedd-iii, varanasi in o and m scheme 2025-26
The work for attending oil leakage from various points of 2 nos. 10 mva power t/f installed at 33/11 kv s/s townhall, varanasi under ee, uedd-iii, varanasi in o and m scheme 2025-26
Read moreSupply and delivery of 50 nos of 100 kgs capacity empty chlorine cylinders ( as per is:3196 (pt.4) with test certificates including obtaining of users license certificate from explosive department, goi for fixing at new chlorination plants installed at small capacity reservoirs and for providing spare cylinders at important chlorination destinations in the distribution system of hmwssb under central chlorination cell qat wing, hmwssb
Supply and delivery of 50 nos. of 100 kgs capacity empty chlorine cylinders (as per is:3196 (pt.4) 2001 with test certificates including obtaining of users license certificate from explosive department, government of india for fixing at new chlorination plants installed at small capacity reservoirs and for providing spare cylinders at important chlorination destinations in the distribution system of hmwssb under central chlorination cell qat wing,hmwssb
Read moreWork of filtration and testing of oil of 630kva transformer and repairs and testing of earth pits for transformers at goregaon pumping station.
Work of filtration and testing of oil of 630kva transformer and repairs and testing of earth pits for transformers at goregaon pumping station.
Read moreArrangement of lighting arrester, new earth pits construction and connection by cu wire etc.for protection of electrical equipment for karma project.
Arrangement of lighting arrester, new earth pits construction and connection by cu wire etc.for protection of electrical equipment for karma project.
Read moreShifting of 04 nos of ht overhead lines from the site of under construction 12.5x3 mva, 33/6.6 kv new substation at utls, ilbl ocp (north), lakhanpur area, mcl
Shifting of 04 nos of ht overhead lines from the site of under construction 12.5x3 mva, 33/6.6 kv new substation at utls, ilbl ocp (north), lakhanpur area, mcl
Read moreConstruction of 51 nos. earth pit with bentonite as back fill compound at rajnagar ro main substation and at different locations in incoming 33 kv feeder.
Construction of 51 nos. earth pit with bentonite as back fill compound at rajnagar ro main substation and at different locations in incoming 33 kv feeder.
Read moreMaking of 6 nos water reservoir at saldanga of new kenda colliery under kenda area
Making of 6 nos water reservoir at saldanga of new kenda colliery under kenda area
Read moreof your Industry type