Tender Details
Particulars | Details |
---|---|
Title |
Qawi Construction Of 2 No. Pump Chamber, Construction Of Boundary Wall And Laying Of Parallel Di Pipeline In Place Of Old Ac/Pvc Damaged Pipeline At Village Qawi.
|
Description |
Qawi Construction Of 2 No. Pump Chamber, Construction Of Boundary Wall And Laying Of Parallel Di Pipeline In Place Of Old Ac/Pvc Damaged Pipeline At Village Qawi.
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 16180 |
EMD | 2.43 Lakh |
Tender Value | |
Place | QAWI |
Link |
AAAAAAAAAA Login to view |
Start Date | April 28, 2025 22:30 |
End Date |
19/05/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreProvision of leftover portion of boundary wall and special repair to existing boundary wall around 324.07 acres of land at village jaydevkasba, pxe chandipur
Provision of leftover portion of boundary wall and special repair to existing boundary wall around 324.07 acres of land at village jaydevkasba, pxe chandipur
Read moreRepair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar
Repair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar
Read moreConstruction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new nh-152) near siwani town in the state of haryana
Construction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new nh-152) near siwani town in the state of haryana
Read moreConstruction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Read moreRe-construction of damaged portion of revetment wall of tower no 132, 130, 06 and 44 of 220kv alusteng-drass- transmission line.
Re-construction of damaged portion of revetment wall of tower no 132, 130, 06 and 44 of 220kv alusteng-drass- transmission line.
Read moreof your Industry type