Tender Details

Particulars Details
Title
Pr Of Road From Lefunga Bazar To Dyanmara (L 2.50 Km) Under Lefunga R.D Block During The Year 2024 25/Sh Gsb, Wbm Iii, Patch Repair,Carpeting, Drain , Retaining Wall And Earth Filling Etc(l 2.50 Km)
Description
Pr Of Road From Lefunga Bazar To Dyanmara (L 2.50 Km) Under Lefunga R.D Block During The Year 2024 25/Sh Gsb, Wbm Iii, Patch Repair,Carpeting, Drain , Retaining Wall And Earth Filling Etc(l 2.50 Km)
Organisation Chief Engineer, PWD (R and B) | State Govt. and UT
Tender Id 2025_CEPWD_57922_1
Reference
Number
178/R/DNIeT/SE-IV/PWD(R n B)/2024-25
Tender Fee 4000
EMD 2.9 Lakh
Tender Value -
Place Mohanpur
Link
View Original Tender Notice

https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=58911

Start Date February 05, 2025 14:30
End Date
Expired 13/02/2025

Expired 607 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.

Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.

Read more
Development of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.

Development of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.

Read more
Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.

Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.

Read more
Development of the pwd road from dhalabil to rc ghat l- 6.30 km under pwd randb khowai sub-division during the year 2026 27 s.h soling wbm carpeting.

Development of the pwd road from dhalabil to rc ghat l- 6.30 km under pwd randb khowai sub-division during the year 2026 27 s.h soling wbm carpeting.

Read more
Development of road from sonamura-boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.166 km

Development of road from sonamura-boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.166 km

Read more
Development of road from sonamura boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.251 km to ch. 0.416 km

Development of road from sonamura boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.251 km to ch. 0.416 km

Read more
Development of road from nh 08 to nh 08 via east raitwisa h s school in c allied road at betcherra t length 700 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch gsb patch wbm and carpeting etc

Development of road from nh 08 to nh 08 via east raitwisa h s school in c allied road at betcherra t length 700 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch gsb patch wbm and carpeting etc

Read more
Development of road from nh 08 near subash sanga club to pabiacherra market l 550 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh wbm carpeting seal coating etc

Development of road from nh 08 near subash sanga club to pabiacherra market l 550 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh wbm carpeting seal coating etc

Read more
Surf work incl constr of subgrade, gsb, wbm, dbm , bc, prime coat, tack coat, hard shoulder and moorum filling on approach rd-1 from kovang to bp-56 from km 0.00 to km 5.00 under 82 rcc/25 brtf/sewak in chandel distt in manipur state

Surf work incl constr of subgrade, gsb, wbm, dbm , bc, prime coat, tack coat, hard shoulder and moorum filling on approach rd-1 from kovang to bp-56 from km 0.00 to km 5.00 under 82 rcc/25 brtf/sewak in chandel distt in manipur state

Read more
Surf wk incl constr of subgrade, gsb, wbm, dbm , bc, p/coat, t/coat, hard shoulder and moorum filling on approach rd-2 from km 0 to km 5.531 and approach rd-3 from km 0 to km 4.835 of manipur river (west bank near bp-47) to bp-50 in manipur state

Surf wk incl constr of subgrade, gsb, wbm, dbm , bc, p/coat, t/coat, hard shoulder and moorum filling on approach rd-2 from km 0 to km 5.531 and approach rd-3 from km 0 to km 4.835 of manipur river (west bank near bp-47) to bp-50 in manipur state

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise