Tender Details
Particulars | Details |
---|---|
Title |
Wbiw/Ee/Cdod/E Nit 02/2024 25
|
Description |
Clearing And Removing Water Hyacinth Including Solid/Semi Solid Compact Mass And Jungle Cutting For Rest Part Of Defunct Dwf Channel, That Is From Ch. 0.808 Km. To 4.458 Km. Of Defunct Dwf Channel For The Period Of 365 Days, Under Calcutta Drainage
|
Organisation | IRRIGATION AND WATERWAYS DEPT. | State Govt. and UT |
Tender Id | 2024_IWD_694141_1 |
Reference Number |
WBIW/EE/CDOD/e-NIT- 02/2024-25 |
Tender Fee | 0 |
EMD | 23295 |
Tender Value | |
Place | DWF channel |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1511482 |
Start Date | June 19, 2024 16:30 |
End Date |
05/07/2024 ( Expired 340 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewClearing and removing of water hyacinth including solid/semi solid compact mass and clearing jungle from 0.00 km. to 7.857 km. of town head cut channel (length 7.857 km) for the period from 22.06.2025 to 31.05.2026, under calcutta drainage outfall
Read moreSupplying and fixing of spare part for maintenance of different ht ers (6.6 kv) operating and comprehensive maintenance of different electrical installed at hocp for period of 365 days.
Supplying and fixing of spare part for maintenance of different ht ers (6.6 kv) operating and comprehensive maintenance of different electrical installed at hocp for period of 365 days.
Read moreWbiw/ee/cdod/e-nit- 03 /2025-26/sl-1
Clearing removing of water hyacinth including solid/semi solid compact mass jungle cutting of fishery feeding channel for a length of 8.00 km) for the period from 07.06.2025 to 31.05.2026 under calcutta drainage outfall sub-division ii of calcut
Read moreWbiw/ee/cdod/e-nit- 02 /2025-26 sl-2
Clearing , removing of water hyacinth including solid/semi solid compact mass , jungle cutting of chandipur khal (length 1.75 km) for the period from 07.06.2025 to 31.05.2026, under calcutta drainage outfall sub-division iii of cdod
Read moreAssistance for proper cleaning of drainage, coal spillage, level crossing, upgradation of coal stock by mechanical means at ir siding and ntpc wharf wall siding of dipka area for a period of 365 days.
Assistance for proper cleaning of drainage, coal spillage, level crossing, upgradation of coal stock by mechanical means at ir siding and ntpc wharf wall siding of dipka area for a period of 365 days.
Read moreCleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Cleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Read moreDi /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days
Di /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days
Read moreWork of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.
Work of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.
Read moreGrass cutting and cleaning of gss campus, gss colony, office and control room at 132/33 kv gss, chandil-ii (manikui) under transmission sub-division chandil-ii (manikui) for the period from 01.04.2025 to 31.03.2026 (365 days)
Grass cutting and cleaning of gss campus, gss colony, office and control room at 132/33 kv gss, chandil-ii (manikui) under transmission sub-division chandil-ii (manikui) for the period from 01.04.2025 to 31.03.2026 (365 days)
Read moreAnnual maintenance of kangsabati office colony by cutting uprooting and clearing jungles, grass,......... including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing from site for a year (365 days) under k.c. s.d no-vii
Annual maintenance of kangsabati office colony by cutting uprooting and clearing jungles, grass,......... including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing from site for a year (365 days) under k.c. s.d no-vii
Read moreof your Industry type