Particulars | Details |
---|---|
Title |
Work Of Replecment Of 11 Kv Ic And Og Vcb, 33 Kv Vcb, Installation Of Battery And Battery Charger And 11 Kv Double Cable At 33/11 Kv Jivnathpur Substation And Replacement Of 400/240sqmm Lt Lead Of Medium Power T/F.
|
Description |
Work Of Replecment Of 11 Kv Ic And Og Vcb, 33 Kv Vcb, Installation Of Battery And Battery Charger And 11 Kv Double Cable At 33/11 Kv Jivnathpur Substation And Replacement Of 400/240sqmm Lt Lead Of Medium Power T/F.
|
Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
Tender Id | 2024_PVVNV_974323_1 |
Reference Number |
64/EDC(C)/2024-25 |
Tender Fee | 1180 |
EMD | 6000 |
Tender Value | |
Place | EDD-Ist, Chandauli |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1707348 |
Start Date | November 16, 2024 14:30 |
End Date |
21/11/2024 ( Expired 207 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and trial for replacement of old 415 v lt power distribution panels installed for mains, dg power supply in b1 b2 c and d blocks and 415 v lt main panel installed in substation with new one in the cmpdi ri-7 colony
Supply, installation, testing and trial for replacement of old 415 v lt power distribution panels installed for mains, dg power supply in b1 b2 c and d blocks and 415 v lt main panel installed in substation with new one in the cmpdi ri-7 colony
Read moreReplacement of damaged equipment installed on the 33kv lines between the 220 kv power substation, chamba, and the 33/11 kv power substation, bhagirathipuram, under the project area, tehri, and painting work on the electric poles.
Replacement of damaged equipment installed on the 33kv lines between the 220 kv power substation, chamba, and the 33/11 kv power substation, bhagirathipuram, under the project area, tehri, and painting work on the electric poles.
Read moreConstruction of control and power cable trench and re-spreading of gravel within switchyard along with renovation of control room building and boundary wall of bamanhat 33/11kv substation under dinhata division wbsedcl
Construction of control and power cable trench and re-spreading of gravel within switchyard along with renovation of control room building and boundary wall of bamanhat 33/11kv substation under dinhata division wbsedcl
Read moreSupply, erection, testing , commissioning for augmentation from 250 kva to 400 kva substation along with replacement of conductor with lt ab cable and installation of 11kv ct/pt (15/5amp) at nowabad fish fram, under the jurisdiction of electric di
Supply, erection, testing and commissioning for augmentation from 250 kva to 400 kva substation along with replacement of conductor with lt ab cable and installation of 11kv ct pt (15 5amp) at nowabad fish fram, under the jurisdiction of electric
Read moreErection/extension and repairing work of 33 kv/11 kv/lt lines/pole and increasing capacity of 11 kv s/s, add. dt installation, replacement of damaged vcb panels, install. of line isolators and replacement of jarjar/damaged cond. under edd atarra
Erection/extension and repairing work of 33 kv/11 kv/lt lines/pole and increasing capacity of 11 kv s/s, add. dt installation, replacement of damaged vcb panels, install. of line isolators and replacement of jarjar/damaged cond. under edd atarra
Read moreEstimate for replacement of 11 kv under ground cable (11 kv phase-2 feeder) 33/11 kv lkg substation under itarsi (t) d/c o and m dn itarsi
Estimate for replacement of 11 kv under ground cable (11 kv phase-2 feeder) 33/11 kv lkg substation under itarsi (t) d/c o and m dn itarsi
Read moreDay to day maintenance work of 33/11kv power transformers, 33kv vcb and mocb,11kv indoor ocb, switchyard isolators and other substations equipment at 33/11 kv central sub-station, balanda under gm unit, jagannath area as and when required for 365 day
Day to day maintenance work of 33/11kv power transformers, 33kv vcb and mocb,11kv indoor ocb, switchyard isolators and other substations equipment at 33/11 kv central sub-station, balanda under gm unit, jagannath area as and when required for 365 day
Read moreInstallation of 3 nos. of 33kv line bays for 33/11kv koutruk substation and erection of 33kv line from iroisemba to national sports university (nsu), koutruk on turnkey basis.
Installation of 3 nos. of 33kv line bays for 33/11kv koutruk substation and erection of 33kv line from iroisemba to national sports university (nsu), koutruk on turnkey basis.
Read moreSupply installation testing and commissioning of 1no 11kv dedicated outgoing vcb fedder panel for supplying power to new court complex at melongthang leh from 66/11kv substation leh
Supply installation testing and commissioning of 1no 11kv dedicated outgoing vcb fedder panel for supplying power to new court complex at melongthang leh from 66/11kv substation leh
Read moreWorks of repairing and replacement of 33kv and 11kv pannel and vcb wiring at 33 11 kv ss mlph jhansi under ee eudd i jhansi
Works of repairing and replacement of 33kv and 11kv pannel and vcb wiring at 33 11 kv ss mlph jhansi under ee eudd i jhansi
Read moreof your Industry type