Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Patch Repair Works On State Highways Under Division. (Package 2)
|
| Description |
Patch Repair Works On State Highways Under Division. (Package 2)
|
| Organisation | Cheif Engineer Kanpur Zone PWD Kanpur | State Govt. and UT |
| Tender Id | 2024_CEKNP_960822_6 |
|
Reference Number |
2193/9A Date-23.09.2024 |
| Tender Fee | 944 |
| EMD | 80000 |
| Tender Value | - |
| Place | Kanpur |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1671151 |
| Start Date | September 30, 2024 17:30 |
| End Date |
Expired
05/10/2024
Expired 742 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
One time improvement of bypassed section of nh44 from ch159.800 to ch163.300 digdole to khooni nallah under package 2 of ramban banihal section in district ramban ut of jk
One time improvement of bypassed section of nh44 from ch159.800 to ch163.300 digdole to khooni nallah under package 2 of ramban banihal section in district ramban ut of jk
Read moreFiber optic patch cord (v2),fiber optic patch cord (v2),fiber optic patch cord (v2),fiber optic patch cord (v2),fiber optic patch cord (v2),fiber optic patch cord (v2),fiber optic patch cord (v2),fiber optic patch cord (v2),fibre patch panel,fibre patch panel,fibre patch panel,small form - factor pluggable transceiver,small form - factor pluggable transceiver,small form - factor pluggable transceiver,small form - factor pluggable transceiver
Fiber optic patch cord (v2),fiber optic patch cord (v2),fiber optic patch cord (v2),fiber optic patch cord (v2),fiber optic patch cord (v2),fiber optic patch cord (v2),fiber optic patch cord (v2),fiber optic patch cord (v2),fibre patch panel,fibre patch panel,fibre patch panel,small form - factor pluggable transceiver,small form - factor pluggable transceiver,small form - factor pluggable transceiver,small form - factor pluggable transceiver
Read moreShort term improvement and routine maintenance of ghoshpukur dhupguri section package i on nh 27 excluding binnaguri bypass and das darga and fatapukur sections in the state of west bengal
Short term improvement and routine maintenance of ghoshpukur dhupguri section package i on nh 27 excluding binnaguri bypass and das darga and fatapukur sections in the state of west bengal
Read moreSupervision consultancy (sc) services for operation and maintenance of package as-01, km 275.00 to km 300.76 (balachera to silchar section) of nh-54 (new nh-27) in the state of assam.
Supervision consultancy (sc) services for operation and maintenance of package as-01, km 275.00 to km 300.76 (balachera to silchar section) of nh-54 (new nh-27) in the state of assam.
Read moreBalance works of 4 lane bangalore chennai expressway from arakkonam to kancheepuram (km 204.500 to km 230.000) (phase iii/package iii) in tamil nadu on epc mode.
Balance works of 4 lane bangalore chennai expressway from arakkonam to kancheepuram (km 204.500 to km 230.000) (phase iii/package iii) in tamil nadu on epc mode.
Read moreDevelopment of greenfield high-speed access controlled corridor from shamli-gorakhpur from ch.143.100 to ch.212.600 in the state of uttar pradesh on ham mode (package-3)
Development of greenfield high-speed access controlled corridor from shamli-gorakhpur from ch.143.100 to ch.212.600 in the state of uttar pradesh on ham mode (package-3)
Read moreDevelopment of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 274.000 to ch. 348.039 in the state of uttar pradesh on ham mode (package-6)
Development of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 274.000 to ch. 348.039 in the state of uttar pradesh on ham mode (package-6)
Read moreDevelopment of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 212.600 to ch. 274.000 in the state of uttar pradesh on ham mode (package-5)
Development of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 212.600 to ch. 274.000 in the state of uttar pradesh on ham mode (package-5)
Read moreDevelopment of greenfield high speed access controlled corridor from shamli gorakhpur from ch. 84.500 to ch. 143.100 in the state of uttar pradesh on ham mode (package 2)
Development of greenfield high speed access controlled corridor from shamli gorakhpur from ch. 84.500 to ch. 143.100 in the state of uttar pradesh on ham mode (package 2)
Read moreof your Industry type