Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Raini Chak Subhai Water Supply Scheme In Block Joshimath District Chamoli
|
| Description |
Construction Of Raini Chak Subhai Water Supply Scheme In Block Joshimath District Chamoli
|
| Organisation | MD (Drinking Water) Peyjal Nigam GoUK | State Govt. and UT |
| Tender Id | 2024_MDPEY_69940_1 |
|
Reference Number |
482/G-12/45 Dated 19.02.2024 |
| Tender Fee | 2360 |
| EMD | 70000 |
| Tender Value | |
| Place | Block Joshimath District Chamoli |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=84029 |
| Start Date | February 22, 2024 22:30 |
| End Date |
Expired
04/03/2024
Expired 873 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreSupply, laying and jointing of pn10pipe 110mm od (sdr 11)water supply scheme in badrinath block- joshimath of district chamoli
Supply, laying and jointing of pn10pipe 110mm od (sdr 11)water supply scheme in badrinath block- joshimath of district chamoli
Read moreConstruction of subhai water supply scheme in block joshimath
Construction of subhai water supply scheme in block joshimath
Read moreConstruction of jhelam water supply scheme in block joshimath
Construction of jhelam water supply scheme in block joshimath
Read moreConstruction of jhelam water supply scheme in block joshimath
Construction of jhelam water supply scheme in block joshimath
Read moreNtpc township ravigram joshimath construction of 0.18 mld capcity water treatment plant dasholi of block joshimath district chamoli under deposit work
Ntpc township ravigram joshimath construction of 0.18 mld capcity water treatment plant dasholi of block joshimath district chamoli under deposit work
Read moreSupply, laying and jointing of g.i. pipe line (m) and other appurtenant works of phase ii joshimath urbon w/s water supply scheme in block joshimath of district chamoli under natural calamity 2023
Supply, laying and jointing of g.i. pipe line (m) and other appurtenant works of phase ii joshimath urbon w/s water supply scheme in block joshimath of district chamoli under natural calamity 2023
Read moreof your Industry type