Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐ Procurement Opportunity: Energy Efficient Pumps For Hyderabad Division ๐ง๐ The Ministry Of Railways, Central Government, Invites Bids For The Replacement Of Conventional Pumps With Energy Efficient Pumps At Its Secunderabad Location. ๐ ๏ธ ๐ Bid Submission Deadline: July 23, 2024, 3:00 Pm Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 110,800. No Tender Fee Is Payable. Detailed Tender Documents Are Available For Review To Gain Complete Insights Into The Project's Requirements. Keywords: Ministry Of Railways, Energy Efficient Pumps, Infrastructure, Government Tender, Central Govt. Ministry/Department, Secunderabad, Hyderabad Division| Particulars | Details |
|---|---|
| Title |
Hyderabad Division: Replacement Of Conventional Pumps With Energy Efficient Pumps
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75788598 |
|
Reference Number |
10-OEW-24-25-SrDEE-M-HYB |
| Tender Fee | 0 |
| EMD | 1.11 Lakh |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75788598/viewNitPdf_4612475.pdf |
| Start Date | June 27, 2024 23:01 |
| End Date |
Expired
23/07/2024
Expired 794 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreSupply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreGnt divn - provision of energy efficient pumps in place of conventional pumps
For complete deion and other details, please refer to tender
Read moreReplacement of existing conventional ceiling fans in all laboratory buildings with 5 star rating energy efficient ceiling fans at csir-iict, hyderabad. (phase 3).
Replacement of existing conventional ceiling fans in all laboratory buildings with 5 star rating energy efficient ceiling fans at csir-iict, hyderabad. (phase 3).
Read moreReplacement of less efficient pump at guptapara filter bed pump house with ie5 raging high efficient pumps
Replacement of less efficient pump at guptapara filter bed pump house with ie5 raging high efficient pumps
Read moreReplacement of existing conventional fixtures and fans with energy efficient fixtures and fans at rla , jaipur
Replacement of existing conventional fixtures and fans with energy efficient fixtures and fans at rla , jaipur
Read moreof your Industry type