Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
💧 Upgrade Opportunity For Feedback Systems At Parbati He Project 💧 Nhpc Limited, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids For The Upgradation Of The Feedback System Of The Main Inlet Valve (Miv) And Brake Jet Valve (Bjv) At The Power House Of The Parbati He Project (Stage Ii), Package C 743, Located In Sainj, Himachal Pradesh. 📅 Bid Submission Deadline: April 25, 2024, 6:55 Pm Tender Fee: Inr 590 Earnest Money Deposit (Emd): Inr 670,000 Interested Bidders Must Possess The Requisite Technical Expertise And Experience In Similar High Value Projects. Detailed Proposals Should Encompass Technical Specifications, Cost Estimates, And A Timeline For Project Completion, Adhering To The Stringent Quality And Safety Standards Required For This Critical Infrastructure Upgrade. Keywords: Nhpc Limited, Feedback System Upgrade, Main Inlet Valve, Brake Jet Valve, Parbati He Project, Power House, Engineering Procurement Construction (Epc) Tender, Central Government Ministry/DepartmentParticulars | Details |
---|---|
Title |
Upgradation Of Feedback System Of Main Inlet Valve (Miv) And Brake Jet Valve (Bjv) At Power House Of Parbati He Project (Stage Ii)(Package C 743).
|
Description |
Upgradation Of Feedback System Of Main Inlet Valve (Miv) And Brake Jet Valve (Bjv) At Power House Of Parbati He Project (Stage Ii)(Package C 743).
|
Organisation | NHPC Limited | Central Govt. Ministry/Department |
Tender Id | 2024_NHPC_801493_1 |
Reference Number |
NH/PP-II/PnC/Pkg. No. C-743/2024 |
Tender Fee | 590 |
EMD | 67000 |
Tender Value | |
Place | Power House of Parbati-II,HE Project, Sainj,H.P. |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=842515 |
Start Date | March 19, 2024 22:30 |
End Date |
15/06/2024 ( Expired 366 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Package iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read morePackage-1, works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw phase-ii solar power park for the development of 1200mw jalaun solar power park under umrepp
Works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw (phase-ii) solar power park for the development of 1200mw jalaun solar power park at pathrahi and amrod in jalaun
Read moreEngaging associate for balance of system package for development of design, engineering, supply, erection, testing and commissioning including 03yrs comprehensive operation and maintenance of 100 mw(ac) solar power project at gsecls re park at khavda
Engaging associate for balance of system package for development of design, engineering, supply, erection, testing and commissioning including 03yrs comprehensive operation and maintenance of 100 mw(ac) solar power project at gsecls re park at khavda
Read moreDesign engineering manufacturing supply installation testing and commissioning of 1 no spherical valve miv along with dismantlement for shanan power house
Design engineering manufacturing supply installation testing and commissioning of 1 no spherical valve miv along with dismantlement for shanan power house
Read moreRepair, maintenance and changing work of 10 and 8 inch main supply line from intake riverside to settling tank at filter house and to settling tank at c and d colony for a period of one year (01 year) under kathara colliery, kathara area
Repair, maintenance and changing work of 10 and 8 inch main supply line from intake riverside to settling tank at filter house and to settling tank at c and d colony for a period of one year (01 year) under kathara colliery, kathara area
Read moreRepair maint of fuel storage system and proper laying of cables in dusts at power house no 5 and connected items at af stn singarsi under age i af singarsi
Repair maint of fuel storage system and proper laying of cables in dusts at power house no 5 and connected items at af stn singarsi under age i af singarsi
Read moreUpgradation of solar power system of 10kw to 15kw installed at the roof of dept. of drawing and painting of the college for supply of electricity to the block connected with room no. 01 to 06
Upgradation of solar power system of 10kw to 15kw installed at the roof of dept. of drawing and painting of the college for supply of electricity to the block connected with room no. 01 to 06
Read morePeriodical and round the clock maintenance job of 4 x 12.75 mw tg sets and associated electromechanical installations within power house, 132 kv substation, forebay, intake and tailrace at rhp, stage ii for 24 months
Periodical and round the clock maintenance job of 4 x 12.75 mw tg sets and associated electromechanical installations within power house, 132 kv substation, forebay, intake and tailrace at rhp, stage ii for 24 months
Read moreAttending the shrinkage and settlement cracks on the interior and exterior wall surfaces and protective coating the area to restore original luster of power house buildings at barrage power house-ii / nerinjipettai in erode generation circle
Attending the shrinkage and settlement cracks on the interior and exterior wall surfaces and protective coating the area to restore original luster of power house buildings at barrage power house-ii / nerinjipettai in erode generation circle
Read morePainting work of main store, ffph, water tank, sprs, parking shed, pump house, guest house and external of b and c type quarter at 400/220kv samba substation j and k
Painting work of main store, ffph, water tank, sprs, parking shed, pump house, guest house and external of b and c type quarter at 400/220kv samba substation j and k
Read moreof your Industry type