Tender Details

Particulars Details
Title
Restoration And Completion Of Balance H. M. Works Of Sheelagarh Di Work Of Parbati He Project,Stage Ii(package No. C 806)
Description
Restoration And Completion Of Balance H. M. Works Of Sheelagarh Di Work Of Parbati He Project,Stage Ii(package No. C 806)
Organisation NHPC Limited | Central Govt. Ministry/Department
Tender Id 2025_NHPC_849777_1
Reference
Number
NH/PP-II/PnC/Pkg. No. C-806/2025
Tender Fee 1770
EMD 4 Lakh
Tender Value
Place Nallah works,Sheelagarh, PHEP-II,H.P.
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=893314
Start Date February 18, 2025 22:30
End Date

11/03/2025 ( Expired 66 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Read more
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Mtc of type ii iii and iv qtr total 24 nos under kumarghat sub divisional hospital during the year 2024 25 sh r c c work finishing work water supply and sanitary line etc

Mtc of type ii iii and iv qtr total 24 nos under kumarghat sub divisional hospital during the year 2024 25 sh r c c work finishing work water supply and sanitary line etc

Read more
Package-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh

Package-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh

Read more
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.

Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Read more
Lot i package civil works package for 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot i civil works comprising of hrt including adits, surge shaft including adits, pressure shaft including adits, underground p/h cavern, bus ducts, underground transformer cavern, underground dt gate operation cavern and others as per scope of work.

Read more
2x600 mw shree singaji tpp, khandwa- work of annual cleaning of drains, roads and other area in plant, sstpp (stage-i and stage-ii), khandwa.

2x600 mw shree singaji tpp, khandwa- work of annual cleaning of drains, roads and other area in plant, sstpp (stage-i and stage-ii), khandwa.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise