Tender Details

Particulars Details
Title
Fiber Optic Patch Cord,Fiber Optic Patch Cord,Fiber Optic Patch Cord,Fiber Optic Patch Cord,Fiber O
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2025/B/6287060
Reference
Number
Tender Fee
EMD
Tender Value
Place
Link https://bidplus.gem.gov.in/all-bids
Start Date June 14, 2025 01:21
End Date

04/07/2025 ( Expired 4 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information: Average Turn Over of Last 3 Years: 3 Lakhs Experience with Gov. Required: Years
Buyer Details
Name: ***********
Address: *********** BAGESHWAR
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army
Office Address: ***********
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Hiring service of not more than 2 years vintage mahindra bolero pickup vehicle for maintenance of optical fiber communication on as and when required basis under ps7 telecom section for a period of two years, extendable by one year upon review.

Hiring service of not more than 2 years vintage mahindra bolero pickup vehicle for maintenance of optical fiber communication on as and when required basis under ps7 telecom section for a period of two years, extendable by one year upon review.

Read more
Hiring service of not more than 2 years old vintage mahindra bolero pickup vehicle for maintenance of optical fiber communication on as and when required basis under ps4 telecom dept. for a period of two years, extendable by one year on review.

Hiring service of not more than 2 years old vintage mahindra bolero pickup vehicle for maintenance of optical fiber communication on as and when required basis under ps4 telecom dept. for a period of two years, extendable by one year on review.

Read more
Development, operation and maintenance of wayside amenities of jodhpur ring road section of nh-125a in the state of rajasthan 2 o-m sitesnh-125a/karwar/ch. 73-620/lhs

Development, operation and maintenance of wayside amenities of jodhpur ring road section of nh-125a in the state of rajasthan 2 o-m sitesnh-125a/karwar/ch. 73-620/lhs

Read more
Master sewerage scheme faridabad- designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m etc.

Master sewerage scheme faridabad- designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m etc.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise