Tender Details

Particulars Details
Title
Balance Work Of Ahmedabad Palanpur Section: Rebuilding/Strengthening Of Existing Minor Bridges (Arch Bridges, Pipe Culverts,Rcc Slab &Amp Psc Slab)(Gc Loading) By Providing Rcc Boxes With Relieving Girder Under Jurisdiction Of Divisional Engineer (North)ahmedabad.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 73121383
Reference
Number
DRM-ADI-179-2023-24
Tender Fee 0
EMD 10.5 Lakh
Tender Value -
Place Mumbai
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73121383/viewNitPdf_4455406.pdf

Start Date February 22, 2024 20:45
End Date
Expired 19/03/2024

Expired 942 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rebuilding of existing overaged steel girder bridges of 12.2m span by psc slab of br. no. 1145/1 up & dn (6x12.2m) in jhs-gwl section.

Rebuilding of existing overaged steel girder bridges of 12.2m span by psc slab of br. no. 1145/1 up & dn (6x12.2m) in jhs-gwl section.

Read more
Sa div:- rebuilding of br.no. 44, 74, 76, 88 & 282 are pipe culvert/rcc slab in krr-dg sec.

Sa div:- rebuilding of br.no. 44, 74, 76, 88 & 282 are pipe culvert/rcc slab in krr-dg sec.

Read more
Salem division: rebuilding of 3 nos ( br.no.sge-13,sge-42 and sge-48) of rcc slab aqueduct / rob in ed-sge section.

Salem division: rebuilding of 3 nos ( br.no.sge-13,sge-42 and sge-48) of rcc slab aqueduct / rob in ed-sge section.

Read more
Replacement of girder/slab/rail cluster with psc slab/rcc box of br. no. 124adn, 125dn, 139dn, 16dn, 30 & 196 in the jurisdiction of sr.den-iii/lko.

Replacement of girder/slab/rail cluster with psc slab/rcc box of br. no. 124adn, 125dn, 139dn, 16dn, 30 & 196 in the jurisdiction of sr.den-iii/lko.

Read more
Jhansi-sithauli-provision of s&t work in connection with the work of rebuilding / replacement of various stone slab bridges by rcc box / slab under jurisdiction of aden/line (41 no.).

Jhansi-sithauli-provision of s&t work in connection with the work of rebuilding / replacement of various stone slab bridges by rcc box / slab under jurisdiction of aden/line (41 no.).

Read more
Provision of s&t work in connection with rebuilding of existing overaged steel girder bridges of clear span 12.2m by psc slab of bridges in bina-dho section of jhansi division.

Provision of s&t work in connection with rebuilding of existing overaged steel girder bridges of clear span 12.2m by psc slab of bridges in bina-dho section of jhansi division.

Read more
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Read more
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)

Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)

Read more
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.

1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.

Read more
S&t works in connection with rebuilding of rcc slab bridges by providing rcc boxes/jacketing and provision of rcc box (2.4 m x 1.2 m) in lieu of various pipe crossings in rewari-hisar-bathinda (western & eastern corridors) and bti-sog under the jurisdiction of sse/sig/hmh and sse/sig/bti over bikaner division.

S&t works in connection with rebuilding of rcc slab bridges by providing rcc boxes/jacketing and provision of rcc box (2.4 m x 1.2 m) in lieu of various pipe crossings in rewari-hisar-bathinda (western & eastern corridors) and bti-sog under the jurisdiction of sse/sig/hmh and sse/sig/bti over bikaner division.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise