Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Work Of Ahmedabad Palanpur Section: Rebuilding/Strengthening Of Existing Minor Bridges (Arch Bridges, Pipe Culverts,Rcc Slab &Amp Psc Slab)(Gc Loading) By Providing Rcc Boxes With Relieving Girder Under Jurisdiction Of Divisional Engineer (North)ahmedabad.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73121383 |
|
Reference Number |
DRM-ADI-179-2023-24 |
| Tender Fee | 0 |
| EMD | 10.5 Lakh |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73121383/viewNitPdf_4455406.pdf |
| Start Date | February 22, 2024 20:45 |
| End Date |
Expired
19/03/2024
Expired 942 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rebuilding of existing overaged steel girder bridges of 12.2m span by psc slab of br. no. 1145/1 up & dn (6x12.2m) in jhs-gwl section.
Rebuilding of existing overaged steel girder bridges of 12.2m span by psc slab of br. no. 1145/1 up & dn (6x12.2m) in jhs-gwl section.
Read moreSa div:- rebuilding of br.no. 44, 74, 76, 88 & 282 are pipe culvert/rcc slab in krr-dg sec.
Sa div:- rebuilding of br.no. 44, 74, 76, 88 & 282 are pipe culvert/rcc slab in krr-dg sec.
Read moreSalem division: rebuilding of 3 nos ( br.no.sge-13,sge-42 and sge-48) of rcc slab aqueduct / rob in ed-sge section.
Salem division: rebuilding of 3 nos ( br.no.sge-13,sge-42 and sge-48) of rcc slab aqueduct / rob in ed-sge section.
Read moreReplacement of girder/slab/rail cluster with psc slab/rcc box of br. no. 124adn, 125dn, 139dn, 16dn, 30 & 196 in the jurisdiction of sr.den-iii/lko.
Replacement of girder/slab/rail cluster with psc slab/rcc box of br. no. 124adn, 125dn, 139dn, 16dn, 30 & 196 in the jurisdiction of sr.den-iii/lko.
Read moreJhansi-sithauli-provision of s&t work in connection with the work of rebuilding / replacement of various stone slab bridges by rcc box / slab under jurisdiction of aden/line (41 no.).
Jhansi-sithauli-provision of s&t work in connection with the work of rebuilding / replacement of various stone slab bridges by rcc box / slab under jurisdiction of aden/line (41 no.).
Read moreProvision of s&t work in connection with rebuilding of existing overaged steel girder bridges of clear span 12.2m by psc slab of bridges in bina-dho section of jhansi division.
Provision of s&t work in connection with rebuilding of existing overaged steel girder bridges of clear span 12.2m by psc slab of bridges in bina-dho section of jhansi division.
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read more1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
Read moreS&t works in connection with rebuilding of rcc slab bridges by providing rcc boxes/jacketing and provision of rcc box (2.4 m x 1.2 m) in lieu of various pipe crossings in rewari-hisar-bathinda (western & eastern corridors) and bti-sog under the jurisdiction of sse/sig/hmh and sse/sig/bti over bikaner division.
S&t works in connection with rebuilding of rcc slab bridges by providing rcc boxes/jacketing and provision of rcc box (2.4 m x 1.2 m) in lieu of various pipe crossings in rewari-hisar-bathinda (western & eastern corridors) and bti-sog under the jurisdiction of sse/sig/hmh and sse/sig/bti over bikaner division.
Read moreof your Industry type