Tender Details
Particulars | Details |
---|---|
Title |
Drawing Of Temporary 3.3k V Ht Over Head Line On As And When Required Basis For Providing Power To Pumps, Lighting Transformers, Etc Along With Fitting Of 11k V Ab Switch (Rotary Type) And Dismantling Of Pole At Jagannathpur Ocp For A Period Of 02 Year
|
Description |
Drawing Of Temporary 3.3k V Ht Over Head Line On As And When Required Basis For Providing Power To Pumps, Lighting Transformers, Etc Along With Fitting Of 11k V Ab Switch (Rotary Type) And Dismantling Of Pole At Jagannathpur Ocp For A Period Of 02 Year
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_321604_1 |
Reference Number |
GM/Bhat/EM/e-open tender/2024-25/50 dtd. 21.11.2024 |
Tender Fee | 0 |
EMD | 1.03 Lakh |
Tender Value | |
Place | SECL, BHATGAON AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333368 |
Start Date | November 21, 2024 22:30 |
End Date |
09/12/2024 ( Expired 153 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling, erection and extn of 6.6kv/3.3kv, 440v/230v oh line in mine supplying power to hemms, mine dewatering pumps and lighting installations and maintenance of 6.6kv, 3.3kv and 440v/230v oh line for one year on as and when req under kdh ocp
Dismantling, erection and extn of 6.6kv/3.3kv, 440v/230v oh line in mine supplying power to hemms, mine dewatering pumps and lighting installations and maintenance of 6.6kv, 3.3kv and 440v/230v oh line for one year on as and when req under kdh ocp
Read moreTrimming branches and cutting of shrub etc. during monsoon period along the overhead line 11kv,3.3kv,440v of kathara ocp under kathara area.
Trimming branches and cutting of shrub etc. during monsoon period along the overhead line 11kv,3.3kv,440v of kathara ocp under kathara area.
Read moreCork sheet changing, oil filtration etc. and replacement of av alarm along with oti wii of 1000kva 6.6kv550v transformer sl.no.c6520/82 sbc(ii)repairing 02 nos transformer(a)1mva 11kv/6.6kv(b) 1mva,11kv/3.3kv with fitting box in 6.6kv/3.3kv incoming
Cork sheet changing, oil filtration etc. and replacement of av alarm along with oti wii of 1000kva 6.6kv550v transformer sl.no.c6520/82 sbc(ii)repairing 02 nos transformer(a)1mva 11kv/6.6kv(b) 1mva,11kv/3.3kv with fitting box in 6.6kv/3.3kv incoming
Read moreRepair maint and replacement of ht electric distribution system along with transformers over head lines ug cables and other connected accessories such as vcbs panel and ht switch gear under age e m 1 under ge central khadki
Repair maint and replacement of ht electric distribution system along with transformers over head lines ug cables and other connected accessories such as vcbs panel and ht switch gear under age e m 1 under ge central khadki
Read moreFitting of 3.3kv pump motor set, dismantling, lifting and also lowering of submersible pumps etc at jambad ocp
Fitting of 3.3kv pump motor set, dismantling, lifting and also lowering of submersible pumps etc at jambad ocp
Read moreDrawing of temporary 3.3kv ht over head line on as and when required basis for providing power to pumps, lighting transformers, etc along with fitting of 11kv ab switch rotary type and dismantling of pole at jagannathpur ocp for a period of 02 year
Drawing of temporary 3.3kv ht over head line on as and when required basis for providing power to pumps, lighting transformers, etc along with fitting of 11kv ab switch rotary type and dismantling of pole at jagannathpur ocp for a period of 02 year
Read moreDrawing of temporary 3.3kv ht over head line on as and when required basis for providing power to pumps, lighting transformers, etc along with fitting of 11kv ab switch (rotary type) and dismantling of pole at jagannathpur ocp for a period of 02 year
Drawing of temporary 3.3kv ht over head line on as and when required basis for providing power to pumps, lighting transformers, etc along with fitting of 11kv ab switch (rotary type) and dismantling of pole at jagannathpur ocp for a period of 02 year
Read moreErection and dismantling of ht (3.3kv) overhead line at potanga quarry for one year (365 days) under urimari ocp
Erection and dismantling of ht (3.3kv) overhead line at potanga quarry on as and when required basis for a period of one year (365 days) under
 urimari ocp.
Read moreInstallation of 11kv grade heavy duty gang operating isolator 02 set at electrical substation and installation of cradle guard at different place of over head line along with lighting arrestor of mohanpur colliery under salanpur area
Installation of 11kv grade heavy duty gang operating isolator 02 set at electrical substation and installation of cradle guard at different place of over head line along with lighting arrestor of mohanpur colliery under salanpur area
Read more(a)providing and fixing of 01 no. 3.3kv, 400a goab switch, lighting arrestor 9kv (rms) and earth pit for 3.3kv oh line at jhirkey pump house under kathara colliery. (b) over head 3.3kv 440 volt line pole cradling concreting pole painting and erection
(a)providing and fixing of 01 no. 3.3kv, 400a goab switch, lighting arrestor 9kv (rms) and earth pit for 3.3kv oh line at jhirkey pump house under kathara colliery. (b) over head 3.3kv 440 volt line pole cradling concreting pole painting and erection
Read moreof your Industry type