Tender Details

Particulars Details
Title
Construction Of 03 Nos.Solar Power Operated Pump Dug Well (Pdw)
Description
Construction Of 03 Nos.Solar Power Operated Pump Dug Well (Pdw) With Over Head Reservoir At Mouza Tarasole, J.L. No. 64 Plot No.906,500 1112 ( Lat 23.953379 N ,Long 87.392792 E) Within Chandrapur G.P Under Rajnagar Dev. Block Under Suri (A I) Sub Div
Organisation WATER RESOURCES DEV. DTE. | State Govt. and UT
Tender Id 2025_WRDD_806682_1
Reference
Number
WRDD/BDNAID/12/2024-25/Gr.A of E.E AI BURDWAN
Tender Fee 0
EMD 42500
Tender Value -
Place Birbhum
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1792556

Start Date January 27, 2025 23:30
End Date
Expired 10/02/2025

Expired 574 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply of water materials non return valve and sluice valve wtp hammagi jack well pump house dambal at gbcmc limits.

Supply of water materials non return valve and sluice valve wtp hammagi jack well pump house dambal at gbcmc limits.

Read more
Construction of a drain and pcc paving in ward no. 03, extending to station road via ranjan chaudhary's house.

Construction of a drain and pcc paving in ward no. 03, extending to station road via ranjan chaudhary's house.

Read more
Construction of a drain and pcc work in ward no. 03, extending to station road via ranjan chaudhary's house.

Construction of a drain and pcc work in ward no. 03, extending to station road via ranjan chaudhary's house.

Read more
Group no-03 construction of drain and path from nagina pustak to transformer via ramugraha singh's house in ward no. 09.

Group no-03 construction of drain and path from nagina pustak to transformer via ramugraha singh's house in ward no. 09.

Read more
Repair work of 800mm dia bws pipe line in gaddi halla 150mm near air wall , 2) koralhalli infront of toll gate bridge ms pipe near bannikatti indian petrol bunk 4) infront of nayara pentro bunk 100mm air vall 5) hammagi jack well pump no 1 and 2, 6) dambal hunasi thota expention joint 7) gaddi halla 90mm ms pipe , korlahalli 2nd bridge and dhoni cross ,hammagi jack well pump house ,adavisambapur bharath petrol bunk , lic office near ring road papanasi kalmeshwar temple cross at gbcmc limits.

Repair work of 800mm dia bws pipe line in 1) gaddi halla 150mm near air wall , 2) koralhalli infront of toll gate bridge ms pipe 3) near bannikatti indian petrol bunk 4) infront of nayara pentro bunk 100mm air vall 5) hammagi jack well pump no 1 and 2, 6) dambal hunasi thota expention joint 7) gaddi halla 90mm ms pipe 8) korlahalli 2nd bridge and dhoni cross 9) hammagi jack well pump house 10) adavisambapur bharath petrol bunk , lic office near ring road 11) papanasi kalmeshwar temple cross at gbcmc limits.

Read more
Construction work including hdpe pipe line motor pump rcc sump etc. for discharging rain water from all water logging area of institute campus into municipal corporation north and east side drain at igims, patna

Construction work including hdpe pipe line motor pump rcc sump etc. for discharging rain water from all water logging area of institute campus into municipal corporation north and east side drain at igims, patna

Read more
Construction of solar operated pump dug-well (pdw 5nos.) cluster at mouza-barghata

Construction of solar operated pump dug-well (pdw 5nos.) cluster at mouza-barghata, g.p.-rupushpur under khyorasole dev. block of birbhum district under ee(a-i), burdwan (a-i) division under core-sector programme

Read more
Construction of 03 nos.(three) masonry dug well along with water pumping system of pdw schemes in salanpur block

Construction of 03 nos.(three) masonry dug well along with water pumping system of pdw schemes in salanpur block

Read more
Construction and installation of solar power operated 1500 mm internal dia pump dug well

This works includes digging, installation of dug well (solar operated) in the district of alipurduar, under dpmu, including supply of all materials for 1500 mm internal dia.dug well and spv operated

Read more
Construction of dug well

Construction of tungcharra masonry dug well i of 2.4m (internal dia) and 8.5 m depth . (on communite basis) at - mouza - tungcharra, jl - 108, plot no- 1188, gp- haludkanali, block- ranibandh, dist- bankura under nmeo(os) of the year 2023-24

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise