Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Unit Iv Painting Of Condensate Storage Tank Outer Area Area And Overhauling Of Boiler Fill Pump Hot Well Make Up Pumps And Related Valves Including The Cost Of Paint And Other All Required Materials During Overhaul For The Year
|
Description |
Ttps Mech Ii Bm Unit Iv Painting Of Condensate Storage Tank Outer Area Area And Overhauling Of Boiler Fill Pump Hot Well Make Up Pumps And Related Valves Including The Cost Of Paint And Other All Required Materials During Overhaul For The Year
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_455035_1 |
Reference Number |
CE/TTPS/SE/M-II/No.231/2024-25 |
Tender Fee | 0 |
EMD | 1500 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=541274 |
Start Date | June 17, 2024 19:30 |
End Date |
02/07/2024 ( Expired 318 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i bm dm plant unit i to iv aoh coh 2025 overhauling of hot well makeup pumps 8 nos and boiler fill pumps 4 nos
Mtps i bm dm plant unit i to iv aoh coh 2025 overhauling of hot well makeup pumps 8 nos and boiler fill pumps 4 nos
Read moreRoutine, prive, breakdown maintenance and overhauling jobs (mechanical jobs) of boiler feed pumps, condensate extraction pumps, cw pumps, vacuum pumps, turbine aux. cooling water pumps, bacw pumps, boiler fill pumps, hotwell make up pumps,
Stator water make up pumps, acw pumps, sgdmcw pumps, tgdmcw pumps, tg cycle make up pumps etc. of 2x210mw and 2x250mw units of guru hargothermal plant (ghtp), lehra mohabbat stage-i and ii on monthly lump-sum basis for a period of one year.
Read moreTtps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Ttps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Read moreTtps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler
Ttps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler
Read moreTtps mech ii bm unit ii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit ii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit i cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit i cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit iv v attending breakdown works in hp valves actuators safety valves wb lrsb prds etc and cleaning of i ii pass boiler structures from 0 metre to 56 metre elevation in unit iv v boiler for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit iv v attending breakdown works in hp valves actuators safety valves wb lrsb prds etc and cleaning of i ii pass boiler structures from 0 metre to 56 metre elevation in unit iv v boiler for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit iii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit iii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm breakdown overhaul of equipments in pressure vessels alkali and acid storage tanks pipe lines pumps and blowers in dm plant i ii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm breakdown overhaul of equipments in pressure vessels alkali and acid storage tanks pipe lines pumps and blowers in dm plant i ii for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit iv reconditioning of coal nozzle and matching with coal nozzle tips released from unit iv boiler during 2025 2026 overhaul
Ttps mech ii bm unit iv reconditioning of coal nozzle and matching with coal nozzle tips released from unit iv boiler during 2025 2026 overhaul
Read moreof your Industry type